My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92771
DRMS
>
Back File Migration
>
Revision
>
REV92771
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:14:09 AM
Creation date
11/21/2007 11:24:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Revision
Doc Date
3/23/2004
Doc Name
Adequacy Review Concerns
From
DMG
To
Seneca Coal Company
Type & Sequence
TR48
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z <br />and spillway system) will need to be submitted following completion of slump repair, <br />this summer. <br />A statement on page 13-51-2 indicates that the discharge characteristics were <br />analyzed with the principal spillway clogged. This is not consistent with the <br />SEDCAD run "Pond 16a as-built 25 yr rev 1.sc4", which indicates the model was <br />run with the assumption that the principal spillway was not clogged. Please amend <br />the narrative as appropriate. <br />8. The Pond 16A "As-Built" map exhibit is erroneously designated Exhibit 16-gC, as <br />previously noted, and should be corrected (presumably should be 13-gC). The <br />bottom width of the emergency spillway needs to be confirmed and the correct <br />dimension used throughout the certification. Note on the Exhibit that Section A-A <br />profile indicates 20 feet, the plan drawing indicates 44 feet, Section B-B indicates <br />44 feet, and the SEDCAD run used 48 feet. Please amend the submittal to reflect <br />the correct width, and ensure consistency among the various map exhibit details <br />and the SEDCAD run. <br />Haul Road K As-Built Documentation <br />9. The road cross-section at 11 +50 of Exhibit t3-23.1A should show the MSHA berm <br />on the downslope edge of the roadway and the toe-of-cutslope ditch (at as-built <br />dimensions). Please amend the Exhibit to include the ditch and berm on the cross- <br />section. Also, please provide or reference the specific permit appendix/attachment <br />for the SEDCAD demonstration for culverts K-1 and K-2 that is referenced in the <br />As-Built Construction Summary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.