Laserfiche WebLink
' ' L <br />TR-48 PRELIMINARY ADEQUACY REVIEW <br />The Insertion Instructions Page should be updated to reference replacement of page <br />7, in Tab 13, Volume 7. <br />2. Insertion Instructions Page erroneously references new Exhibit 13-9b "Pond 016A <br />As-Built", under Tab 13, Volume 9. The referenced exhibit already exists ("Pond <br />016 Design Revision"). The new map should thus probably be designated 13-9c. <br />The actual exhibit map submitted is for some reason designated Exhibit 16-9C, <br />which would appear to be an error. Please amend the Exhibit designation and <br />insertion instruction reference as appropriate. <br />Table 13-5...Design Statistics for Culverts... <br />There are 3 culverts not indicated on the original, previously approved design map. <br />One of these culverts (K5) appears from the map Exhibit 13-23.1A (and comparison <br />with approved Exhibit 13-23.1) to be associated with a segment of the haulage <br />route within the immediate pit disturbance vicinity, and thus not actually on a <br />designated haul road subject to specific design standards. Please verify that this is <br />the case. Inclusion of the pit boundary on Exhibit 13-23.1A, as shown on Exhibit <br />13-23.1, would be helpful. On the new Road K Construction Summary page text, <br />applicant states that this culvert is "a temporary 36-inch culvert that directs <br />temporary flows from the disturbed area to Pond 017. This culvert will be removed <br />once drainage concerns are decided and approved by the Division and SCC". Please <br />clarity on both the exhibit and the construction summary page that the culvert is <br />located on a travel route within the immediate mine pit area. Also, the construction <br />summary page is designated 13-51.2, which would appear to be an error, since <br />Appendix 13-51 pertains to Pond Ot6A "As Built". The erroneous page designation <br />will need to be corrected. <br />Pond 006 Phase V As Built Documentation <br />4. Performance of the as-built structure has been demonstrated to be in compliance <br />with the rules applicable to settleable solids. However, there is an inconsistency in <br />the in the design documentation. The "Structure Summary" on page 4 of the <br />SEDCAD run for the As-Built design indicates a peak settleable concentration of <br />0.01 ml/I, which conflicts with the summary page listing of 0.02 ml/I. Also, <br />information has not been presented to demonstrate compliance with rules <br />associated with flow elevations through the emergency spillway. Please amend the <br />summary page to correspond with the SEDCAD run. Also, please provide a 25-year, <br />24-hour SEDCAD run for Pond 6 Phase V to demonstrate compliance with <br />emergency spillway flow elevation. <br />Pond O16A As-Built Documentation <br />There are a couple typographical errors on page 13-51-2, Certification Statement, <br />which need to be corrected. "8CC" should be "SCC". Also, in same sentence, <br />"4.OS.6" and "4.OS.9" should be "4.05.6" and "4.05.9", respectively. <br />6. The SEDCAD runs and hydrology details are acceptable for the Pond 016A As-Built. <br />Final "As-Built" certification for the entire pond (rather than just the embankment <br />