Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cm['d <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />________I__________________________________. <br /> <br />sheet 4 of 4 <br />Cost (S) <br />I__________.. <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING 4ELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />3 ~ Seal production wells (75 a 544,083.13) 153,306,235 <br /> Crourd water monitoring for 1 yr. ~ 549,000 <br /> Subsidence monitoring for 5 yrs. I f10, 000 <br />22 ~ Plug monitoring wells I f45, 671 <br /> <br />Subtotsl (L ): 53,470,906 <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Deseri prim I Cost (S) <br />I --------------'-----_---I--_-----___ <br />I I <br />2 I Demolitim I (1,779,494 <br />19to21 I Seeding I (472,257 <br />7 I Mab/DemoD ~ ~ I ~-~f17,057 <br />Subtotal (M): f2,268, 808 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 56,247,595 <br />____________ <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD d PROFIT <br />Item No.~ Item Descriptim I Cost (f) <br />._ _____.____________._._ __ - <br />1. I <br />I Public liability Insurance.... ~I <br />1.SSOX,of dir. ~ __- <br />f96, 838 <br />2. I Cmtractor's Performance Bond 1.550% of dir. I 596,838 <br />3. I Cmtrsctor's Profit........... 10.00% of dir. ~ fb24, 759 <br />4. I Job Superinterdent.. ~ 524,000 <br />Subtotal (A ): 5842,435 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 57,090,030 <br />B. DNG PROJECT ADMINI STRATTON E%PENSES <br />Item No.~ Item Description ~ Cost (f) <br />___..~_ I ~~_._____~_.__~_________.._______. I.._ <br />1. ~ Minerals Program Adm 5.00% of cntr.~ (354,501 <br />NET INDIRECT COST PERCENTAGE: 19.76% Subtotal (g): 5354,501 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through S): ft, 196,936 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f7,444,531 <br /> <br />