Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />N. EARTH4ARK STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />________I__~___,._______________________,.__________________~____.._____ <br />~ ~ <br />~ ~ <br />~ ~ <br />I. EARTHl10RK <br />Task No.~ <br />________I_..... <br /> <br />^A'. '- .~ <br />Subtotal (H): <br />____________ <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task Description ~ Cost (f) <br />.. ~. ..... .. ? x. _ _ <br /> <br />Subtotal (I): <br />J. EARTH(ARK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />72 ~ Replace topsoil on drill pads d essoe. roads ~ 567,404 <br />~ <br />13 ~ <br />Replace ~ <br />topsoil in Piceance facilities area ~ <br />510,019 <br />~ <br />14 ~ <br />Replace ~ <br />topsoil an Piceance Site main access roads <br />520,094 <br />15 ~ Replace topsoil on well field service road ~ f15,264 <br />16 ~ Replace topsoil at test mine facility ~ 572,096 <br />18 ~ <br />~ Replace soil R Yellow Cr. Jeep Trail reelipnment ~ f4,830 <br /> <br />24 ~ <br />~ <br />~ <br />~ <br />~ <br />Replete ~ <br />soil, laydown area n. of Piceance Facility <br />~ <br />~ <br />~ <br />~ <br />56,418 <br />I .. t:~~;l,; <br />C r.._ <br />Subtotal (J): f136,125 <br />