Laserfiche WebLink
`+r <br />HOURLY PRODUCTI O~ <br />Job Condition Corrections <br />_________________________ <br />Alt. = 6,9]5 fc. <br />Alt. adz ustmenc ........... <br />Job efficiency ... ilsh/dl <br />Nec Corrections <br />Load Equipment Capacity <br />_______________________ <br />Raced capacity <br />Bucket fill factor <br />Atlj usted capacity <br />Truck Capacity <br />______________ <br />weight eas is ~. <br />Sheet 2 of 3 <br />Trvck/LOatl Team Support equipment <br />Trvck Loader Load Area Dump Area <br />__________________________________________ <br />1.000 1.000 N/A N/A <br />0.870 0.830 N/A N/A <br />0.830 O.B30 N/A N/A <br />________ ________ ________ ________ <br />7.000 LCY roominal Teaped) <br />------- Fill material description: <br />1.100 Other - rock dirt mixtures (100-12 Ott <br />9.700 LCY <br />Volume Has is: <br />Material weigh[ = 2,650 lbs/LCY ~ Struck capacity = 22.80 <br />Ma[. description -------- ~ Neaped capacity = 30.90 <br />Decomposed rock- 25t Rock, ]St Earth ~ - --- - <br />____________________________________ ~ Average 26.85 LCY <br />Raced payload = 80,000 lbs. ~ ------- <br />________ <br />Payload volume 30.19 LCY ~ Max. Avg. Volume - <br />26.85 <br />LCY <br />Adj. truck volume based on discreet no. of loader passes 23.10 LCY <br />Load Equi pmen[ Cycle Time <br />Number of discreet loader passes required to fill truck 3 <br />Track loaders- ------ <br />Load material description: N/A <br />_______________________________ <br />Excavators/Shovels - cycle time vs. job condition rating: __________ <br />N/A _ <br />- selected value within basic rating N/A <br />Track loaders - basic cycle time elements: Load time = N/A min. <br />Mdneuver Cime N/A <br />Dump Cime = 0.1 <br />Unadjusted Basic tycle Cime = 0.5]5 min. <br />Wheel/Track loaders- ------- <br />Cycle Time Fa cc ors: Description Factor (min.l <br />Material -Mixed material 0.020 <br />Pile condition tamped by truck 0.020 <br />Truck Ownership -Common ownership of trucks 6 loaders -0.040 <br />Operation -Constant operation -0.090 <br />Target -Small Carge[ 0.040 <br />Ne[ cycle Cime adj. = 0.000 min. <br />Adjusted Basic Cycle Time = 0.5]5 min. <br />Total load time per truck incl. ezcha nge time adj 1 250 min. <br />'Ibulk of 1st pass completed during truck exchange) ------- <br />