My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92263
DRMS
>
Back File Migration
>
Revision
>
REV92263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:43 AM
Creation date
11/21/2007 11:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976009HR
IBM Index Class Name
Revision
Doc Date
12/2/1996
Doc Name
ESTIMATING FORMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Cycle Time Sheet 3 of ? <br />________________ <br />Exchange = 0.R0 min. Adj. for altitude 0.80 min. <br />Load = 1.250 min. " = 1.25 min. <br />Maneuver S dump = 1.20 min. = 1.20 min. <br />Travel Time (haul S recurn): <br />Road cond. descr.:RUtted dirt road, little/no maim ., 1-2" Cite penetration <br />_____________________________________________________________ <br />Haul route <br />Road Length Grade Rolling Total Velocity Travel time <br />seg. q if t) res. (41 res. (il res. lkl Ifpml Imin) <br />______________________________________________________________________ <br />1 1,875 -8.00 5.00 -3.00 3360 0.66 <br />2 1,300 0.00 5.00 5.00 1695 0.89 <br />______________________________________________________________________ <br />Haul time 1.50 min. <br />Re[u rn route ---- - <br />1 1,300 0.00 5.00 5.00 3200 0.51 <br />2 1,875 R.00 5.00 13.00 1602 1.27 <br />`lst fi last seg. adj. for accel. /dec el. Return time = 1 ,78 min. <br />Total Truck Cycle Time = 6 ,53 min. <br />Loader Un1[ Prod.= 676.10 LCY/Hr - Adz. for efficiency= 561 .16 LCY/Hr <br />_________ <br />Track Un1t Prod.= 212.32 LCY/Hr Adj. for effrcienc y= _____ <br />176 ___ <br />.23 <br />LCY/Hr <br />_________ <br />Optimal number of trucks per loading unit _____ ___ <br />3 <br />Selected number of trucks per loading unit 3 <br />Hourly truck team production 528 .68 LCY/Hr <br />Ne[ Hourly Truck/Loader Team Production 528 .68 LCY/Hr <br />Ne[ Hourly Multiple T/L ': eam Production 528 60 LCY/Hr <br />JOB COST: <br />Flee[ size 1 T/L Team(s) Total .lab Time: 107. "11 HOUL9 <br />________ <br />Unit Cost $0.926 /LCY Total Soh Cost: <br />________ _ _________ <br />$52,714 <br />_________ <br />
The URL can be used to link to this page
Your browser does not support the video tag.