My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92263
DRMS
>
Back File Migration
>
Revision
>
REV92263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:43 AM
Creation date
11/21/2007 11:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976009HR
IBM Index Class Name
Revision
Doc Date
12/2/1996
Doc Name
ESTIMATING FORMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.. <br />Truck tycle lime Sheet 3 Of 3 <br />________________ <br />Exchange = 0.R0 min. Adz. for altitude = 0.80 min. <br />Load = 1.100 min. " " = 1.19 min. <br />Maneuver b dump = 1.20 min. = 1.20 min. <br />Travel Time (haul 6 returnl: <br />Road cond. descr.:RUtted dirt road, little/no main[., 1-2" Lire penetration <br />_____________________________________________________________ <br />Haul route <br />Road Length Grade Rolling Total Velocity Travel came <br />seg. q (fU res. (k) res. 14) res. Itl Ifpm) (mint <br />______________________________________________________________________ <br />1 1,250 2.00 5.00 ]. 00 1290 1.10 <br />______________________________________________________________________ <br />Haul time 1.10 min. <br />Return route ------ <br />______________________________________________________________________ <br />1 1,250 -2.00 5.00 3.00 3360 0.58 <br />____________________________________________________________ <br />•lst b last seg. adj. for acce 1./decel. Return time ______ <br />0 ___ <br />.58 _ <br />min. <br />Total Truck tycle Time = 9 .85 min. <br />Loader Vnit Prod.= '103.55 LCY/Hr Adj. for efficiency= 583. 95 LCY/Hr <br />_______-_ <br />Truck Um[ Prod.= 285.69 LCY/Hr - Adj. for efficiency= _____ <br />23'1 ___ <br />.12 <br />LCYJHr <br />_________ <br />Optimal camber o£ trucks per loading unit ______ __ <br />2 <br />Selected number of tacks per loading unit 2 <br />Hourly truck team production 9'14. 24 LCY/Hr <br />Net Hourly Truck(LOader Team Production : 499. 24 LCY/Hr <br />Net Hourly Multiple T/L Team Production 9'14. 24 LCY/Hr <br />JOB COST: <br />Fleet Size 1 T/L Team lsl Total Sob Time: 159. 89 Hours <br />Un1t COS[ $0.986 /LCY Total Job Cosc: <br />_-______ _ 559, SB9 <br />_______-_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.