My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92263
DRMS
>
Back File Migration
>
Revision
>
REV92263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:43 AM
Creation date
11/21/2007 11:19:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976009HR
IBM Index Class Name
Revision
Doc Date
12/2/1996
Doc Name
ESTIMATING FORMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- <br />HOURLY PRODUCTI O~ <br />Job Condition Correct cons <br />Alt. = 6,995 Ft. <br />Alt. adj ustmen[ ........... <br />Job eEf rciency ... (lsh/dl <br />Net Corrections <br />Load Egmpment Capacity <br />• Sheet 2 of 3 <br />Truck/Goad Team Support Equipment <br />Truck Loader Load Area Dump Area <br />1.000 1.000 N/A N/A <br />O.B30 0.830 N/A N/A <br />0.830 O.B30 N/A N/A <br />Rated capacity 7.000 :.CY (nominal heaped) <br /> -------- Fill material description: <br />Bucket fill factor 1.100 Other rock tlirt mixtures (100-120tI <br /> <br />Adjusted capacity __ __ __ <br />7.700 _____ <br />LCY ___________________________________ <br />Truck Capacity <br />______________ <br />weight Basis: <br />Volume Basis: <br />Material weight = 2,650 lbs/LCY ~ Struck capacity = <br />Mat, description -------- ~ Heaped capacity = <br />Decomposed rock- 25k Rock, 75k Earth <br />____________________________________ ~ Average = <br />Rated payload = B0, 000 lbs. <br />Payload volume = 30.19 LCY ~ Max. Avg. Volume <br />________ <br />Adj. truck volume based on discreet no. of loader passes <br />Load Equipment tycle Time <br />_________________________ <br />Number of discreet loader passes required to fill truck <br />Track loaders- <br />Load material description: N/A <br />22.80 <br />30.90 <br />26.85 LCY <br />26.85 LCY <br />23.10 LCY <br />3 <br />Excavators/Shovels - cycle time vs. job condition racing: N/A <br />- selected value within basic rating N/A <br />Track loaders - basic cycle time elements: Load time N/A min. <br />Maneuver time = N/A <br />Dump Cime = 0.1 <br />Unadjusted Basic tycle time = 0.575 min. <br />Nheel/Track loaders- -______ <br />Cycle Time Factors: Description Factor (min.) <br />Material -Mixed material 0.020 <br />Pile condition Dumped by truck 0.020 <br />Truck Ownership -Common ownersh tp of trucks fi loaders -0. D90 <br />Operation -Cons [ant operation -0.090 <br />Target -Nominal to rge[ 0.000 <br />NeC cycle C1me adj. _ -0.040 min. <br />Adj used Basic Cycle Time = 0.535 min. <br />Total load time per crock rncl. exchange time ad).` 1.170 min. <br />`(bulk of 1st pass completed during crack exchange) ------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.