My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92117
DRMS
>
Back File Migration
>
Revision
>
REV92117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:35 AM
Creation date
11/21/2007 11:18:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
2/17/1995
Doc Name
Midterm Review Findings Document
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review 9 Raton Creek Mines <br />January 6, 1995 C-82-055 <br />Technical Revision TR-15 <br />Submitted January 6, 1994 to modify hydrologic designs of Watershed Diversion 1 <br />and 2. The Division approved this revision on February 8, 1995. <br />Bond Release Revision SLr01 <br />Phase I, II, and III bond release request for the Burlington Northern Railroad <br />Loadout submitted August 31, 1993. SLr01 application found complete on <br />November 2, 1993. Division issued its proposed decision to approve SIr01, <br />thereby reducing the bond amount by $7807.00, on February 28, 1994. The <br />Division's proposed decision to approve SL-Ol was not contested and became final <br />on April 22, 1994; subsequently the total bond amount was reduced from <br />$213,638.00 to $205,831.00. <br />Bond Release Revision SLr02 <br />Phase I bond release request for the mine site was submitted December 27, 1994. <br />Upon receipt of the proof of publication, the application can be found complete <br />as per 3.03.2(1)(d). SL-02 Phase I application requests the release of $118,121.00 <br />or approximately 57% of the total bond amount currently held for the Raton <br />Creek Mines. If SL02 is approved, the bond amount may be decreased from <br />$205,831.00 to $87,710.00. <br />STATUS OF STIPULATIONS <br />Listed below are all of the stipulations imposed since the permit renewal and the status <br />of those stipulations. <br />Stipulation No. 6 -originated from permit renewal. <br />WITHIN 60 DAYS OF PERMIT RENEWAL APPROVAL, THE PERMITTEE <br />WILL PROVIDE TO THE DIVISION AN ADDITIONAL BOND AMOUNT <br />OF $22,366.00, INCREASING THE BOND HELD BY THE DIVISION FROM <br />$189,965.00 TO $212,331.00. THIS BOND INCREASE ORIGINATED FROM <br />THE 1990 MIDTERM REVIEW. <br />Status: complied with. Bond was increased to $212,331.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.