Laserfiche WebLink
Midterm Review 8 Raton Creek Mines <br />January 6, 1995 C-82-OSS <br />Technical Revision TR-O8 <br />Submitted May 12, 1993 to provide hydrologic designs for drainage culverts and <br />graveled road crossings of drainage ditches. TR-08 was approved October 22, <br />1993. <br />Technical Revision 'IR-09 <br />Submitted May 12, 1993 to provide hydrologic designs for the southern watershed <br />diversions. 'IR-09 was approved December 7, 1993. <br />Technical Revision '1'R-10 <br />Submitted June 4, 1993 to reclassify the haul road as an access road. TR-10 was <br />approved November 19, 1993. <br />Technical Revision 'IR-11 <br />Submitted June 8, 1993 to reduce hydrologic monitoring. TR-11 was approved <br />September 2::, 1993. <br />Technical Revision 'IR-12 <br />Submitted July 6, 1993 for sediment pond modification necessary for engineering <br />certification. TR-12 was approved October 19, 1993. <br />Technical Revision 'IR-13 <br />Submitted DE:cember 6, 1993 to request an alternative postmining land use for the <br />Burlington N~~rthern Railroad Loadout. The application for TR-13 was withdrawn <br />by EFMC on May 20, 1994, following approval of Phase I, II, and III bond release <br />for the BN L~adout. <br />Technical Revision '[R-14 <br />Submitted M;irch 2, 1994 in response to Stipulation 11 which required submittal <br />of a plan by which all highwalls would be reclaimed in accordance with the Rules <br />and Regulations. The review of TR-14 was postponed while the Division <br />completed its rule changes addressing reclamation of highwalls. TR-14 was <br />approved with conditions on July 8, 1994. <br />