My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92117
DRMS
>
Back File Migration
>
Revision
>
REV92117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:35 AM
Creation date
11/21/2007 11:18:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
2/17/1995
Doc Name
Midterm Review Findings Document
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review 8 Raton Creek Mines <br />January 6, 1995 C-82-OSS <br />Technical Revision TR-O8 <br />Submitted May 12, 1993 to provide hydrologic designs for drainage culverts and <br />graveled road crossings of drainage ditches. TR-08 was approved October 22, <br />1993. <br />Technical Revision 'IR-09 <br />Submitted May 12, 1993 to provide hydrologic designs for the southern watershed <br />diversions. 'IR-09 was approved December 7, 1993. <br />Technical Revision '1'R-10 <br />Submitted June 4, 1993 to reclassify the haul road as an access road. TR-10 was <br />approved November 19, 1993. <br />Technical Revision 'IR-11 <br />Submitted June 8, 1993 to reduce hydrologic monitoring. TR-11 was approved <br />September 2::, 1993. <br />Technical Revision 'IR-12 <br />Submitted July 6, 1993 for sediment pond modification necessary for engineering <br />certification. TR-12 was approved October 19, 1993. <br />Technical Revision 'IR-13 <br />Submitted DE:cember 6, 1993 to request an alternative postmining land use for the <br />Burlington N~~rthern Railroad Loadout. The application for TR-13 was withdrawn <br />by EFMC on May 20, 1994, following approval of Phase I, II, and III bond release <br />for the BN L~adout. <br />Technical Revision '[R-14 <br />Submitted M;irch 2, 1994 in response to Stipulation 11 which required submittal <br />of a plan by which all highwalls would be reclaimed in accordance with the Rules <br />and Regulations. The review of TR-14 was postponed while the Division <br />completed its rule changes addressing reclamation of highwalls. TR-14 was <br />approved with conditions on July 8, 1994. <br />
The URL can be used to link to this page
Your browser does not support the video tag.