My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV92117
DRMS
>
Back File Migration
>
Revision
>
REV92117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:35 AM
Creation date
11/21/2007 11:18:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Revision
Doc Date
2/17/1995
Doc Name
Midterm Review Findings Document
Type & Sequence
MT3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review 11 Raton Creek Mines <br />January 6, 1995 C-82-055 <br />report indicated little or no potential for significant discharge. The portals were <br />sealed in June 1991. As of January 1995 no discharge has been observed. <br />Stipulation No. 10 -originated from permit renewal. <br />WITHIN 90 DAYS OF PERMIT RENEWAL APPROVAL, THE PERMITTEE <br />WILL SUBMIT FOR APPROVAL A DETAILED PROPOSED COMPACTION <br />TESTING PROGRAM TO BE PERFORMED ON THE COAL REFUSE <br />WASTE PILE. THIS PROPOSED PROGRAM WILL ADDRESS <br />COMPLIANCE WITH APPLICABLE .COMPACTION REQUIREMENTS OF <br />RULE 4.10.4(3)(b). IF THE TESTING PROGRAM INDICATES THAT THE <br />COAL REFUSE WASTE PILE DOES NOT MEET THE APPLICABLE <br />COMPACTION REQUIREMENTS OF RULE 4.10.4, THE PERMTTTEE WILL <br />SUBMIT AND COMMIT TO IMPLEMENTATION OF PLANS FOR A <br />STABILITY EVALUATION TO ASSESS COMPLIANCE WITH THE <br />OVERRIDING STABILITY DESIGN CRITERIA OF RULE 4.10.4(2). <br />Status: complied with. Compaction requirements have been satisfied. <br />Stipulation No. 11 -originated from permit renewal. <br />WITHIN 180 DAYS OF PERMIT RENEWAL APPROVAL, THE PERMTTTEE <br />WILL SUBMIT FOR APPROVAL PLANS FOR HIGHWALL ELIMINATION <br />AS ALLOWED BY THEN CURRENT REGULATORY REQUIREMENTS <br />FOR ALL REGULATED HIGHWALLS WITHIN THE PERMIT AREA. <br />THESE PLANS SHOULD FACILITATE REVIEW AND DEVELOPMENT OF <br />SITE-SPECIFIC RECLAMATION MEASURES FOR INDIVIDUAL <br />HIGHWALL SEGMENTS TO BEST MEET OVERALL RECLAMATION <br />OBJECTIVES. <br />Status: complied with through TR-14. All highwalls have been backfilled, and the <br />operator applied for Phase I Bond Release at the mine site on December 27, <br />1994. <br />Stipulation No. 12 -originated from permit renewal. <br />WITHIN 30 DAYS OF PERMIT RENEWAL APPROVAL, THE PERMITTEE <br />WILL SUBMIT TO THE DIVISION COPIES OF WRITTEN COMMENTS <br />CONCERNING THE PROPOSED POSTMINING LAND USE FROM THE <br />SURFACE OWNERS OF THE PERMITTED AREA. WRITTEN <br />COMMENTS FROM ANY STATE OR LOCAL GOVERNMENT AGENCIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.