Laserfiche WebLink
<br /> <br />Mr. Stephen Self - 4 - April 4, 1985 <br />Comment: The subsidence monitoring plan submitted on January 30, 1985 does <br />not comply with this stipulation (which is a condition of the <br />permit) or with the Regulations; therefore it is not acceptable. <br />Under Rule 2.05.6(6)(c)(D) and 2.05.6(6)(c)(E), subsidence must be <br />monitored quarterly and a report submitted to the Division <br />semi-annually. Eastside Coal must revise their subsidence <br />monitoring plan within 30 days to comply with these rules and the <br />stipulation. <br />Stipulation No. 12 <br />The permittee will submit to the Division, within 120 days of permit <br />issuance, a plan for sealing portals in accordance with 30 CFR 75.1711. <br />Comment: A review of Division records indicates that the submittal date for <br />Stipulation No. 12 is April 14, 1985. The Division feels it would <br />be inappropriate to grant the requested extension at this time. <br />The Division urges Eastside Coal to make every effort to meet the <br />original time frame. <br />Si erely,. <br />s ph W. Oliver <br />Rec amation Specialist <br />/ljc <br />8718E <br />