Laserfiche WebLink
<br />RECLAMATION COST SUNMARY cont'd <br />E. EARTHtJORK - RIPPING <br />Task M~ <br />______ <br />16 ~ <br />17 ~ <br />18 <br />19 I <br />F. EPRTNLIORK ROAD RECLAMATION <br />Task #~ iask 9esc ri pti on <br /> <br />Last (S) <br />E192 <br />52,307 <br />51,273 <br />519.763 <br />Subtotal (E): E23,535 <br />Cost (S) <br />20 ~ Rip Haut Roads <br />21 ~ Remove Haul Raad Subbase and Place on Gob Pile <br />22 ~ Rip New Truck loadout Area <br />23 ~ Haul New Truck Loadaut Subbase to Gab Pile <br />24 ~ Pull Back CuL/Fill Material from Haul Road Narrowing <br />25 ~ Haut Road Material Back to Cut Slopes <br />26 ~ Regrade Narrowed Section of Road <br />27 ~ Rip Gob Pile Road ~ <br />28 ~ Regrade Gob Pile Road ~ <br />29 ~ Rip pttess Road ~ <br />30 ~ Haul Access Road Surface co Gob Pile ~ <br />31 ~ Regrade Access Rcad ~ <br />~ ~ <br />~ ~ <br />I <br />Task Description <br />Rip U[ility Bench <br />Rip Portal Bench <br />Rip New Truck loadout/Coal Stockpile <br />Rip Entire Regraded Area <br />592,137 <br />511,520 <br />41,940 <br />54,987 <br />5276,295 <br />5165,551 <br />588,274 <br />51,867 <br />54,619 <br />5583 <br />51,828 <br />52,454 <br />S~c:_:~~. i .. X052, ]55 <br />--a- 3 :' <br />