Laserfiche WebLink
<br />RECLAMATION COST SUMMART cant'd <br />B. EARTHYORK HIGHYALL REDUCTION <br />cask <br />_____ M~ <br />_~___________ Task <br />___________ Description <br />_______________________ ~ Cost (f) <br />_______I______~_____ <br /> NONE <br />Subto [al (B ): <br />C. EARTHWRK - NASTE/TAILINGS PILE CAPPING AND/CR COVER PLACEMENT <br />Task M~ Task Description <br />_ <br />_ <br />_~ <br />_____ <br />___ ~ Cos[ (f) <br />___ <br />___________ <br />__~_' <br />11 ~ __~~____ <br />Haul Top ___________,.______ <br />____ <br />_ <br />__ <br />__ <br />1' from Stockpile Area to Cob Pile I <br />~ f5,409 <br />12 ~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ Place 4' Cover on Gob Pile ~ 530,291 <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />~ <br />Sub[otaL (C): 535,700 <br />D. EAR7HNORK FILL COMPACTION <br />Task p~ <br />------I <br />73 ~ <br />14 <br />t5 I <br />Task Descri pci on <br />•------------~--------------------------------------I <br />Conpact Backfilled Portal Bench, Roads and Utility <br />Ccmpact Bac kfilled Material ac Neu Truck Loadout/Cod <br />Compact Material ,caul ed to Gab Pila <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Cos[ (E) <br />558,788 <br />56,449 <br />51,355 <br />-------------------------- <br />