Laserfiche WebLink
<br />AN INTEREST IN THE STRUCTURE THAT DAMAGE TO THE STRUCTURE IS 70 <br />B.E COMPENSATED FOR BY THE OPERATOR, OR WHERE SUCH AN AGREEMENT <br />CANNOT BE REACHED, THE APP,LICAN7 PROVIDES AN APPROPRIATE <br />,ENGINEERING EVALUATION THAT DEMONSTRATES THAT SUCH STRUCTURES <br />SHALL NOT.B.E DAMAGED .BY PROPOSED CONSTRUCTION MATERIALS EXCAVATION <br />OPERATIONS; <br />(f) THE .MINING OPERATION IS .LOCATED UPON LANDS: <br />(I} WHERE MINING .O,PERA7IONS ARE PROHIBITED BY LAW ,OR <br />REGULATION WITHIN THE BOUNDARIES OF UNITS .OF THE NATIONAL~FA.RK <br />SYSTEM, 7HE NATIONAL WILDLIFE REF,U.GE SYSTEM, 7HE NATIONAL SyS7EM <br />OF TRAILS, THE NATIONAL ,WILDERNESS PRESERVATION SYSTEM, 7HE ;WILD <br />AND SCENIC RIVERS SYSTEM, OR NATIONAL RECREATION AREAS; <br />(II) WHICH ARE WITHIN .OR .WITHOUT THE BOUNDARIES OF, AND ARE <br />OWNED, LEASED, OR HAVE BEEN DEVELOPED BY, ANY RECREATI,O.NAL <br />FACILITY ESTABLISHED PURSUANT TO ARTICLE 7 OF TITLE 29, C.R.S., <br />UNLESS OTHERWISE AUTHORIZED BY THE APPROPRIATE GOVERNING BODY OR <br />UNLESS THE OPERATION MILL NOT CREATE ANY SURFACE DISTURBANCE <br />THEREIN; <br />(III) WHICH ARE WITHIN THE BOUNDARIES OF, AND ARE OWNED, <br />LEASED, OR HAVE BEEN DEVELOPED BY, ANY PARK AND RECREATIDN <br />DISTRICT ESTABLISHED PURSUANT TO ARTICLE 1 OF TITLE 32, L.R.S., <br />UNLESS OTHERWISE AUTHORIZED BY THE BOARD OF DIRECTORS OF THE _ ~'~ <br />DISTRICT OR UNLESS THE OPERATION WILL N07 CREATE ANY SURFACE <br />DISTURBANCE THEREIN; AND <br />(IV) WHICH ARE WITHIN THE BOUNDARIES OF ANY UNIT OF THE <br />STATE PARK SYSTEM OR ANY STATE'RECREATIONAL AREA IN WHICH THE <br />ENTIRE FEE ESTATE IS OWNED BY THE STATE OF COLORADO, UNLESS THE <br />MINING OPERATION IS APPROVED JOINTLY BY THE BOARD, BY THE <br />GOVERNOR, AND BY THE BOARD OF PARKS ANO OUTDOOR RECREATION, OR <br />UNLESS THE OPERATION. WILL NOT CREATE ANY SURFACE DISTURBANCE <br />THEREIN. <br />(g) THE PROPOSED RECLAMATION PLAN DOES NOT CONFORM TO THE <br />REQUIREMENTS OF SECTI N 'i4-z~ s-~~~ <br />4-32. - 6. Duties of operators - reclamation plans. <br />(1) OPERATOR TO WHOM A PERMIT IS ISSUED PURSUANT TO THIS <br />ARTICLE SHALL PERFORM THE RECLAMATION PRESCRIBED BY THE <br />RECLAMATION PLAN ADOPTED PURSUANT TO THIS SECTION. <br />(2) RECLAMATION PLANS SHALL BE BASED UPON PROVISIONS FOR, <br />OR SATISFACTORY EXPLANATION OF, ALL GENERAL REQUIREMENTS FOR THE <br />TYPE OF RECLAMATION CHOSEN. THE DETAILS OF THE PLAN SHALL BE <br />APPROPRIATE T6 THE TYPE OF RECLAMATION NECESSARY TO ACHIEVE THE <br />PROPOSED POSTMINING LAND USE. <br />(3) (a) EACH YEAR, ON THE ANNIVERSARY DATE OF THE PERMIT, `_ <br />PAGE 20-SENATE SILL 95-156 <br />