Marr Preliminary Adequacy <br />1, Financial, Compliance and Related Information <br />1. The application form states different acreages for the disturbed and <br />affected areas. According to the definition of "disturbed area" and <br />"affected area" in Rule 1, these ac reaaes should be equal on surface <br />mines. Please change page 2 of the form accordingly. <br />2. Why was Exhibit 56 from the approved permit application not included in <br />the Permit Revision? Have the obligations associated with abandonment of <br />the original road been dropped? Please clarify this issue and replace <br />Exhibit 56 if appropriate. <br />ions Plan - Rules 2.05.2, 2.05.3(1), 2.05.3(2) 2.10.3(2), 4.01, and 4.03 <br />3. We are unable to locate a discussion on maximization of the use and <br />conservation of the coal resource in the permit application per 2.05.2(1) <br />and 4.01.1(1). Please prepare a discussion on this or reference a <br />pre-existing narrative in the permit application. <br />4. The Division needs one set of original certified maps per 2.10.3(2). <br />Please make arrangements to replace one set or to send your engineer in <br />to sign off on one set of volumes. <br />5. Please revise Map 7, Mine Area Pre-Mining Topography, to show the permit <br />area prior to construction of the 720 stockpile and pit per 2.10.3(1)(j) <br />to permit an asse55ment of approximate original Contour. <br />6. Will KCC bench the Pit 1 area as illustrated by Figure 13 (page 2.05-4) <br />or is this pit configuration only to be used on future pit areas? <br />7. We are unable to correlate the numbers between Table 63, the first table <br />in Exhibit 25 entitled "Backfill Plan Summary", and the calculations <br />presented on page 4.14-8. <br />a. It appears that Kerr is assuming that each ton of coal is <br />equivalent to 1 BCY. Do your shipping records document this fact? <br />Tables in our office suggest that on the average raw bituminous <br />coal weighs 2,150 lb/bcy. Please comment and adjust Table 63 and <br />the equations on pane 4.14-8 if necessary. <br />b. Please modify Table 63 to reflect the topsoil volumes removed from <br />each pit. Then modify the pit volume numbers accordingly. <br />c. What conversion factor do you use to transfer between CCY and LCY? <br />Are these backed up by operational documentation? It apoears that <br />there is a different conversion between LCY and CCY in Pit 3 than <br />in Pits 1 and 2 on the Exhibit 25 table. <br />