Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 61 C <br />Date : 09/10/2007 <br />User : JHB <br />Agency or organization name :Colorado Division Of Reclamation, Mi <br />Permit or other job action : TR61 <br />Task description : Regrade pipeline corridor, road <br />8 diversion ditch <br />1UUKLi cuu~rmcn, ...,~. <br />Basic machine : <br />Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cost hour : $0.75 10 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosVhour : $205.28 Total fleet cosUhour $205.28 <br /> <br />MATERIAL QUANTITIES .: <br />Indlal Swell Loose <br />volume : 11,894 CCY factor : 1.125 volume : 13,158 LCY <br />Source of estimated volume :2.05-55, 2.05-56 <br />Source of estimated swell factor :Caterpillar Handbook _ „ ,;, <br />ION <br />C <br />Inn ('ondition Correction Factors <br />Source <br />T <br />HOURLY PRODU {av <br />) <br /> Operator skill : 0.75 g. <br /> t <br />50 f <br />Material consistency : <br />1.10 <br />(Cat HB) <br />Average push distance : ee 00 en <br />) <br />( <br /> 5 LCY/hr <br />110 <br />2 Dozing method : 1. . <br />g <br />Unadjusted hourly production : . <br />, 1 <br />00 (avg <br />) <br /> Visibility : . . <br /> Job efficiency : 0.83 (lshifF/day) <br />Material consistency description : Spoil pile : 0.80 (fnd-rf) <br />Partly consolidated stockpile 99 <br />0 (Cat HB) <br /> Push gradient : . <br />Average push gradient : 1.00 % (pos) Altitude : 1.00 <br />87 <br />0 (Cat HB) <br />(Cat HB) <br /> t <br />700 f Material weight : . <br />Average site altitude : ee <br />6, 1 <br />00 (S/SU/U) <br /> Blade type : . <br /> 650 Ibs/LCY <br />2 Net correction : 0.47 <br />Material weight : , <br />Weight description <br />7 <br />rth <br />5% E <br />Adjusted unit production : <br />992.33 <br />LCY/hr <br />Decomposed rock - 25% Rock, a <br /> Adjusted fleet production : 992.33 LCYIhr <br /><::: <br />,. .. <br />JOB TIME AND COST ; <br /> <br /> <br />otal job time : <br /> <br /> <br />3.26 <br /> <br /> <br />ours <br />Fleet size : 1 Dozers) <br />Unit cost : $0.207 ILCY Total fob cost : $2,722 <br />State :Colorado <br />County : Routt <br />Site : Foidel Creek Mine <br />PermiUjob# : C1982058 <br />Abbreviation :none <br />Filename : C056-61 C <br />And <br />?' <br />T2 k ~ ~`t' 1 3~ `f /o ~~ <br />