Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 616 <br />Date : 09/10/2007 <br />User: JHB <br />State :Colorado <br />County : Routt <br />Site : Foidel Creek Mine <br />Agency or organization name : CDRMS <br />Permit or otherjob action :TR61 <br />Task description :replace 12" topsoil on pond footprint, pipeline corridor & access rd. corridr <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 19, 795 <br />Basic machine :Cat D9R - 9SU (2005) <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br /> Utilization <br />Ownership cosUhour : $64.72 NA <br />Operating cosUhour : $98.84 100 <br />Ripper op.cosUhour : $0.00 NA <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $196.34 Total fleet cosUhour <br />Horsepower: 405 <br />$196.34 <br />Swell Loose <br />CCY factor : 1.125 volume : 22,270 LCY <br />Source of estimated volume :p. 2.05-45.8f, 2.05-45.7, Map 24 & Exh. 490 <br />Source of estimated swell factor :caterpillar handbook <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (I <br />Average site altitude : 6,700 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv oacked <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />rit ~ ~ <br />1 Dozers) <br />$0.188 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />/~' I?~, 3 <br />Permitfjob# : C1982-058 <br />Abbreviation :none <br />Filename : C056-61 B <br />Source <br />0.75 (avg.) <br />1.10 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshift/day) <br />0.80 (fnd-rfJ <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.49 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />iG f~~ ~- <br />