My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-11-10_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
2004-11-10_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:22 PM
Creation date
11/21/2007 11:15:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
11/10/2004
Doc Name
NPL & EWI Standards for G.W. Program
From
American Soda LLP
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Calculation <br />Field <br />~.cyu~a iviy Standard <br />unless Method Standard from I Classification <br />s ecified r Regulation 41 <br />~ha Result I <br />.;,i , 15 Human Health <br />_(pCi/L~ __~ M9310 <br />Alpha Minimum <br />Detectable Activity <br />IpCi/L) _ _ <br />Gross Beta Result <br />IPCI/L) _ _ <br />ass Bela Error (pCy~ M9310 <br />Beta Mirnmum 1 <br />Detectable Activity <br />An analysis of the data representing the period of record indicates areas where <br />changes could be made to streamline the sampling program and target <br />constituents which have a greater probability of being key indicators in an aquifer <br />system potentially influenced by solution mining activities. Secondly, additional <br />changes would remove monitoring constituents from the list That yield little or no <br />value to the monitoring program. Each quarterly ground water monitoring report <br />previously submitted provides a summary of the baseline descriptive statistics <br />and descriptive statistics of the operational phase specific to the individual well <br />and monitoring constituent. <br />As a result of high natural gas prices and respectively high production costs per <br />ton of soda ash, the solution mining of nahcolite will be temporarily suspended <br />and the Yankee Gulch production site mothballed until economic viability is <br />reestablished. This technical revision will address the interim status period of <br />time during which the Piceance plant remains in temporary suspension of <br />production operations and the period of time following the suspension when <br />commercial production resumes. <br />Table 3 summarizes the wells, constituents. and frequency of sampling proposed <br />for the interim status (IS) time period during temporary suspension of <br />production operations. During the interim status time period, water levels and <br />water quality sampling would be completed once per quarter for each sampling <br />
The URL can be used to link to this page
Your browser does not support the video tag.