My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91849
DRMS
>
Back File Migration
>
Revision
>
REV91849
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:13:21 AM
Creation date
11/21/2007 11:15:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
11/26/1994
Doc Name
EAGLE NO 5 AND 9 MINES C-81-044 TR 25
From
DMG
To
CYPRUS EMPIRE CORP
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ ~ • • <br /> <br />STATE OF III IIIIIIIIIIIIIIII <br />999 <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br /> <br />1313 Sherman St., Room 215 ~ <br />Denver, Colorado 80203 I~~~ <br />Phone: 1303) 866-3567 <br />FAX. 13031832-8106 <br /> DEPARTMEIJT OF <br />November 26, 1994 NATURAL <br /> RESOURCES <br /> Roy Rnmer <br />Mr. Marcus Middleton c°°ef"°` <br />Environmental Enplneer lames S Lochhead <br />i <br />D <br />Cyprus Empire Corp. ve Dueclor <br />&ttul <br />Mi <br />h <br />l a <br />g <br /> c <br />ong <br />ae <br />. <br />P.O. Boz 68 Drvevon Dveuor <br />Craig, Colorado 81626 <br />Re: Eagle No. 5 and 9 Mines (C-81-044) Technical Revision No. 25 <br />Dear Mr. Middleton: <br />I am forwarding the Division has received from the U.S. Fish and Wildlife Service regarding <br />the proposed development drill hole DDP-94-001 on to you. The four concerns that the <br />USF&WS have identified include: <br />1) Will there be any water depletion involved with the drilling project? If artesian <br />water is encountered during drilling, please outline Cyprus Empire's method of <br />managing the water. <br />2) All precautions shall be taken to prevent the entry of contaminants into the river. <br />Equipment must be cleaned and all oil leaks repaired prior to crossing the river. fuel <br />tanks must be moved across the river on a truckbed or trailer. And all materials <br />produced by drilling shall be contained and prevented from entering the river. <br />3) The drilling pad shall not be located in a high flow channel or other area inundated <br />by high spring flows. <br />4) Disturbance to trees shall be avoided. Disturbance to understory vegetation shall be <br />minimized as much as possible. <br />The Division's hydrologist has identified several concerns as well. These items follow: <br />5) CEC states that the borehole casing will protrude a minimum of five feet <br />above the ground surface to prevent surface flow into the borehole. How will <br />the casing be capped to prevent infiltration of precipitation? <br />
The URL can be used to link to this page
Your browser does not support the video tag.