Laserfiche WebLink
Jame t 3, 2006 <br />dlr. Byron Walker <br />Re: Hayden Gu[eh Loadout, Permit C-92-O8/ <br />TR-07 Responses to2nd Adequacy Comments <br />Page 3 <br />Item 16 Note that the access road in the response is the loop haul road discussed under Item 11. <br />It could be reclassified (frons haul road to access road) under this technical revision <br />shoztld the road be retained as such. <br />Response: Tab ]2 has been revised to include the haul road extension {HGLF-HR1A) and clarify <br />the access road discussion. <br />Insertion instructions for updating the permit application package accompany this submittal. Please <br />note that a third volume has been added to the permit application package. Tab 12, Facilities, will <br />be in Volume II. Tabs 13 through 24 will move to the new volume, Volume III. Should you or any <br />other member of the Colorado Division of Minerals and Geology staff have any questions regarding <br />this information please do not hesitate to contact the undersigned at 970-871-6125. <br />Regards <br />Hydro-Environmental Solutions, Inc. <br />(on behalf of Hayden Garlch Terminal, Inc. ) <br />~~ <br />ohn C. Weinman <br />Project Manager <br />attach <br />cc: Brian Dunfee, Peabody Energy <br />Hydro-Environmental Solutions, Inc. <br />P. D. Bor 772996 <br />57 10`h Street, Suite B <br />Steamboat Springs, CO 80477 <br />(970J 871-6125 <br />