Laserfiche WebLink
<br />Mining will be done in phases that range in area of approximately 17-35 acres. The maximum <br />disturbed area during mitring will be approximately 51 acres. The area in this amendment will <br />be mined out and reclamation completed within approximately 5 years. <br />All other aspects of the permitted mining and reclamation plan not discussed here will not <br />change. <br />The following table contains values of Disturbance areas when they are the greatest during Phase <br />II. <br />TABLE OF DISTURBANCE <br />C MAJOR DISTURBANCE <br />Mining 14.9 ac <br />']topsoil/Overburden Stockpiles 1.1 ac <br />Stripping Prior to Mining 9.0 ac <br /> <br />C40DERATE DISTURBANCE <br />Plant Site/Product Stockpiles 17.5 ac <br />Roads/Conveyor Alignment 4.4 ac <br />Shoreline Grading 1.5 ac <br />Office/Scale House 0.6 ac <br /> <br />C MINOR DISTURBANCE <br />Reclaimed and Seeded 1.5 ac <br />Reseeded Year 2 (20% non-germination) 0.3 ac <br /> <br />TOTAL DISTURBED ACREAGE 50.8 ac <br />Wetlands •~vere identified in the area identified in this application. An application was made to <br />the Army Corps of Engineers for an Army Nationwide Permit to allow these areas to be filled <br />and/or excavated. <br />A letter fr~~m the Army Corps of Engineers is presented after this section that grants an Army <br />Nationwid~^ Permit to fill and/or excavate 0.35 acres of wetlands in the process of mining on this <br />project. <br />3 <br />