My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91357
DRMS
>
Back File Migration
>
Revision
>
REV91357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:54 AM
Creation date
11/21/2007 11:10:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977560
IBM Index Class Name
Revision
Doc Date
9/29/1994
Doc Name
ROCKY FORD EAST PIT FN M-77-560 AMENDMENT AM-001
From
DMG
To
VALCO INC
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Rocky Ford East Pit/M77-560 <br />9/29/94 <br />page 3 <br />Valco commits to liability for damages to structures owned by <br />other parties, which are damaged as a result of wining or <br />reclamation activities. This liability exists until Valco is <br />released from this permit. <br />Floor levels of (new) bowl and lake <br />The floor of the bowl will be 10 feet above the water table. <br />The lake will be about 15 feet deep. Is the waiver table <br />widely variable? Are there significant seasonal. changes <br />during irrigation or wet seasons? operator must ensure that <br />the finished bowl depth will not be such that it: exposes <br />groundwater. <br />Post-mining features to remain <br />The access road will remain, but please specify which <br />portion(s). How will reclamation of any roads be conducted? <br />~' Please submit a reclamation map showing exactly what the site <br />will be like. <br />Reclamation of new and old portions of the permit <br />Please specify which parts of the areas to be added will be <br />tl~~, ,1~, reclaimed according to existing reclamation plans, snd which <br />1b ~ are subject to new plans. Please include all ;necessary <br />specifications for slopes, ripping, topsoil depths, seeding, <br />~~.°""~OkJ~ fertilizer, mulch, etc. If any of this is presently unknown, <br />~=~~ but to be based on future "best practices" of the Arkansas <br />a+~''~' Valley Revegetation Project research, that type of c~~mmitment <br />is acceptable. That will become a stipulation of approval, to <br />be completed before release. <br />Addition of Stage BL <br />As discussed, Stage BL should be included, due to it being the <br />area to receive the slurry solids. This is 7.22 acres in all. <br />-~ Will slurry material be so deep as to be exposed ab~~ve water <br />and change the pond shape? If so, please specify what <br />reclamation will occur there. Present pond banks i=here are <br />stable and vegetated. Besides culvert installation (and <br />.,removal) activity, will the banks be redisturbed? <br />Substitute water supply plans <br />You have submitted the plans, but they have not been approved <br />by the Division of Water Resources (DWR). Our approval of the <br />amendment can be made, contingent on your receiving DWR <br />approval. Until such approval, however, the permit: for the <br />amended area will not be issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.