Laserfiche WebLink
RECLAMATION COS~MMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description <br />shge[ 4 of 4 <br />Cost (S) <br />Subtotal (K): <br />Lost (E) <br />Subtotal (L): <br />M. MISCE LLANEWS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />s3a ~ Demob ti onD ispose of 10'x10'x10' mass a 50.22/c.f~ 5220 <br />Several ~ Seeding Per encl. worksheets s4a, n4a, p5a, p5b~ 511,205 <br />Fencing <br />p6a ~ Mob/Demob Per attached worksheet <br />Subtotal (N): 511,425 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 534,231 <br />11. INDIRECT COSTS <br />__________________________________________ <br />A. CONTRACTOR'S OVERHEAD & PROFIT ____ <br />Item No.l Item Description <br />__ ~ <br />______ Lost (E) <br />____________ <br />________I <br />1. ~ _________________________________ <br />Public Liability Insurance.... _________ <br />1.SSOX of I <br />dir. ~ 5531 <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ 5531 <br />3. ~ Contractor's Profit........... 10.OOY. of dir. ~ E3, 423 <br />4. ~ Job Superi nt endent..equip. oper. serves as super. <br />Subtotal (A): 54,484 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 538,715 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description Cost (E) <br />________I_____________________________________________________________. <br />1. ~ Minerals Program Adm S.OOX of cntr.~ E1, 936 <br />NET INDIRECT COST PERCENTAGE: 18.76Y. Subtotal (B): 51,936 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 56,420 <br />____________ <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 540,651 <br />