My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV91229
DRMS
>
Back File Migration
>
Revision
>
REV91229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:48 AM
Creation date
11/21/2007 11:09:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977205
IBM Index Class Name
Revision
Doc Date
3/17/2000
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COS~MMARY cont'd shget 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task <br />_____ No. Task Description ~ <br />__________________________________________________I__ <br />___ Lost (E) <br />__________ <br />p4a I <br />~ Purchase and truck boulders to site to build ~ E2, 400 <br /> grade control structures. <br />p4b ~ Cut a channel in the ranch dike to direct river. ~ E493 <br />p4c <br />____ ~ Build grade control struct. 1 oper, 1 labor, 16hr~ <br />_________________________________________________________ E821 <br />__________ <br />_ Subtotal (H): E3,714 <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task <br />-- No.l Task Description ~ <br />____________________________________________________ <br />--- Cost (E) <br />__________ <br />___ <br />n2a I <br />~ Construct wing wall deflectors in south bank of ~ 82,775 <br /> north instream parcel. 5 total - 5.55 c.y. <br /> Excavate trench, lay in wire mesh, pour conc rete.~ <br /> Assume E100.00/c.y. <br />pia ~ Construct wing wall deflectors in south bank of ~ E8,880 <br /> Phase I - 16 total - 5.55 c.y. each. <br /> Excavate trench, lay in wire mesh, pour concret e.~ <br /> ~ Assume 5100.00/c.y. <br />Subtotal (I ): E11, 655 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />___-----I__________________________________________________~-'--------__ <br />p2a ~ Replace topsoil an banks of Phase I and on area ~ E3,376 <br />of Phase 11 stripped of topsoil (1100' x 200'). <br />________________________________________________________________ <br />Subtotal (J ): E3, 376 <br />
The URL can be used to link to this page
Your browser does not support the video tag.