Laserfiche WebLink
<br />3. The bond calculation does not include a cost estimate for <br />removal of the 8 inch water line to Foidel Creek. Please <br />submit this information. <br />4. Upon review of the materials submitted with PR-03, it is <br />apparent that pages 2.05-27(a) from TR-23 and 2.05-23(b) from <br />PR-03 repeat much of the same information. This confusion <br />should be identified and corrected. <br />5. The 8 inch mine water discharge line will be subsided by the <br />first panel in the eastern mining district. What measures <br />will be implemented to ensure that this discharge line does <br />not rupture due to subsidence at some point prior to its <br />confluence with Foidel Creek? <br />Sine/1,E~- <br />Kent A. Gorham <br />Environmental Protection Specialist <br />cc: Dan Hernandez, DMG <br />