Laserfiche WebLink
Mr. William f. Carter • • <br />© Colorarla Division ofMirserals fr Geology <br />Septem6er25, 7997 <br />Page 1 <br />• Installation of the temporary hoist frame, hoist winches, shah sinking platform <br />(Galloway), and support equipment <br />• Sinking of the shah using conventional drill, blast, muck, and lining methods <br />• Placement of shah excavation material in abandoned underground workings <br />• Removal of the sinking plain (hoist, winches, Galloway, and support <br />equipment) and temporary shop and water tank <br />• Installation of a shah cover (intake shaft only) or fan, housing, and drive and <br />control systems (fan installation) and access control fencing <br />• Reclamation of construction staging areas <br />Total surface disturbance associated with the proposed shale construction activities would be <br />approximately 0.8 acres including the shaft site, construction staging area, drainage <br />collection ditches, light-use road, and soil stockpile areas. Most of this disturbance would <br />however, be temporary, with reclamation of all disturbance except the shafr collar, fan <br />installation (if required) access road, and soil stockpi]e area (approximately 0.4 acres) upon <br />completion of shaft sinking activities. It is anticipated that shafr construction would be <br />initiated after receipt of required permit approvals in 1997 or early 1998 and would be <br />completed in approximately four months. The following permit materials have been <br />reviewed and revised, as appropriate, to describe design, operation, and reclamation plans <br />and practices associated with construction of the proposed ventilation intake shafr. In <br />addition, specific permit materials as noted with an asterisk have been updated and revised to <br />correct previous errors or maintain organizational consistency. Please note that page 2.05- <br />31a, as provided in this submittal, was submitted as part of both TR-28 and MR-40 which <br />were approved on the same dace. The version provided with this submittal is the most <br />current and accurate. <br />TABLE OF REVISIONS <br />PERMIT ITEM DESCRIPTION <br />Pages viii' and viii-6 Volume 6 and List of Maps (revised to include 'C' Gulch Ventilation <br /> Shaft in Title of Maps 5-090, 091, and 093 <br />Page 2.04-7a Location Map TC-3 Degassification Borehole (a a number revision) <br />Page 2.04-39a Water Monitoring Parameters Ifor page 2.05-39a, return [o <br /> superseded version ITR-20, 4/4/941 and eliminate new age) <br />Page 2.0468•, 68a•, 68b•, 68c•, Soils Description (revised for page numbering consistencyl <br />and 68d• <br />Page 2.04-69 and 70 Vegetation and Wildlife Descriptions (revised to add ventilation <br /> shaft) <br />Page 2.05-5c Mine Facilities Summar (revised to add ventilation shaft) <br />Pages 2.05-13', 13a, 136', 13c •, Facilities and Roads Oescrip[ions (revised to add description of <br />13d', 13e', 13f', 13g •, 13h', and ventilation shaft and for page numbering consistencyl <br />13i• <br />Pages 2.05-15', 15a, 156', and 15c Ponds, Impoundments, and Diversions (revised to address drainage <br /> and sediment control considerations) <br />Pages 2.05-17', 17a •, 17b•, 17c', Blasting Descriptions and Coal Handling Facilities (revised to <br />17d•, 17e•, 18•, and 19b• cleanu format[in inconsistencies and errors) <br />Pages 2.05-20 and 20a' Disturbance Area Summary and Reclamation Description (revised to <br /> include additional disturbance and correct forma[ errors, 20b <br /> eliminated) <br />Pages 2.05-22b•, 23', and 23c' East Yard Gob Disposal Area Contours and Roads Letter (revised for <br /> page numberin consistent 1 <br />Pages 2.05-24•, 25 •, 26', 26a', and Reclamation Plan (revised to correct format errors) <br />28• <br />Pa a 2.05-31a• Lower Hubbard Creek Fan Site Restoration Iravised version) <br />~. rblrrflrm.r~ry1 <br />9: UNr yJ <br />