Laserfiche WebLink
Mr. Berhan <br />November 1, <br />Page 3 <br />Keffe~ • <br />1996 - Amendment no. 3 <br />2) All conveyors in the following areas have been removed. <br />Area 1 Stages 0 and 1, Area 2 Stage 2, Area 3 Stage 3, <br />Area 4 Stages 4-5-6-7-11, Area 5 Stage 10. <br />The conveyor that is now in use, is in Area 5 Stage 8. <br />This is 1060 lineal feet, with a grizzly type hopper on <br />the receiving end. As we proceed with our mining, we <br />will have to gradually add 1400 lineal feet of conveyor. <br />This would go up into Area 5 Stage 12. As mining proceeds the <br />same conveyor will be moved from West to East. No <br />additions will be made until Stage 12 and 13 and part of <br />Stage 9 is mined out. Estimated time would be 2009. <br />Then, we will have to gradually add another 2400 lineal <br />feet to complete this area. <br />3) Status of Reclamation in Permit no. M - 77-573. <br />Area 1 Stage O <br />Al as een released with the <br />feet along the south shoreline <br />water pipe removed and graded. <br />All that is left to do is grade <br />Also, 300 lineal feet of shore <br />be seeded, fertilized and mulch <br />been done. <br />Stage 1 <br />This has all been released. <br />exception of 1520 lineal <br />roadway. It needed a <br />The pipe has been removed. <br />the area where the pipe was. <br />on the west end needed to <br />placed on it. This has <br />Area 2 Stage 2 <br />The west and south sides have been backfilled, sloped and <br />graded. However, we are filling in this lake from east <br />to west. Approximately 7.0 acres have been filled in. <br />Grass planting has also been done on the south and west <br />sides. We will have a continuing effort to fill this lake. <br />This will be used as an Industrial area. <br />Area 3 Stage 3 <br />This area has the backfilling, grading and topsoiling <br />all done. It has grown up with natural vegetation and <br />is serving as a very good wildlife habitat. <br />Area 4 - Stages 4-5-6-7-11 (66.82 acres) <br />We have completed mining in this area. While the water <br />was still down, we backfilled, graded and topsoiled the <br />entire area. It is ready to be seeded now, and our plans <br />are to do this very soon and shut off the pumps. This will <br />result in a 32 to 34 acre Lake. There will be two lakes <br />in this area. The other lake is approximately 5.2 acres. <br />This area has been backfilled, graded, topsoiled and <br />natural vegetation has grown along the shoreline. <br />