My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90746
DRMS
>
Back File Migration
>
Revision
>
REV90746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:25 AM
Creation date
11/21/2007 11:06:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
Revision
Doc Date
2/16/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />DOZER COST i PERFORMANCE DATA YORKSXEET cont'd sheet 2 of 2 sheet <br />Model: Cat D7G <br />ADJUSTED COST SUBTOTALS <br />~------------------------------ Ownership Costs ------------~ - Overhaul 8 Opereti ng Costs <br />Dozer, ROPS i Attachment N2: ~ Dozer i ROPS: <br />Single shifts (77.62 58.81 f6.75 f2.23 56.44 52.76 55.20 f8.87 f2.25 f0.00 S0. <br />Double shifts 573.21 f4.47 f3.07 Attach ment k2: <br />Triple shifts f77.75 f2.93 f2.05 f0.00 f0.00 f0.00 f0.00 f0.00 f0.00 50.00 f0. <br />HOURLY OPERATOR PAGES <br /> Base Fringe F.I. C.A Urw:npl. Yk.COmp. Total ~ Shift <br />Labor Classif itation <br />_________________________________ Rete <br />___________ Benefits <br />___________ 7.70% <br />_______ <br />____ 6.20% <br />____ <br />_ 12.50% <br />___ <br />____ (f/hr)~ <br />___ Differential <br />___ <br />-- <br /> <br />Dozer operator (< 70hp) <br />f13.60 <br />13.50 _ <br />_ <br />f1.05 _ <br />__ <br />50.84 __ <br />f1.70 __ <br />__I <br />520.69 ~ .__ <br />.___...I <br />Day 50.00 ~ <br />2 shift/day <br />avg.: <br />f0. <br />Dozer operator (>=70hp) (14.30 f3.50 f1.70 50.89 f1.79 f27.58 ~ Swing: f0.30 ~ 3 shift/day avg.: 50. <br />Mechanic 574.60 f3.50 f7.12 f0.91 f1.83 521.95 ~ Night: f0.45 <br />HgIRLY EW IPNENT COST SIAMARY <br /> Ownership ~ Operating 8 Overhaul Costs ~ Operator ~ Total <br /> Costs ~ Dozer Ripper ~ Costs ~ Cost/XR (f) <br />L C C S <br />Sing le shifts 532.57 528.57 50.00 f27.58 582.72 <br />Double shifts 520.b9 (28.57 f0.00 (21.73 (70.98 <br />Triple shifts f76.73 528.57 50.00 521.83 567.72 <br />EW IPNENT PERFORMANCE DATA <br /> - - - EW IPNENT SPECI F]CATIONS - - - <br /> Horsepower Trans. Neight Length Yidth Height Fuel Ripper <br /> Description (F HP) Type (tons) (f t.) (ft.) (tt.) Type Type <br />MACH]NE MAKE i MODEL: [et D7G 200 Powershift 19.0 17.3 8.4 70.5 diesel N/A <br />D02ER BLADE: Straight N/A N/A 3.8 N/A 72.0 4.2 N/A N/A <br />ATTACHMENT k1: ROPS Cab N/A N/A N/A N/A N/A N/A M/A N/A <br />ATTACHMENT f2: NJA MIA N/A N/A N/A N/A N/A ~ N/A <br /> Total Yt.: 22.8 tons <br />
The URL can be used to link to this page
Your browser does not support the video tag.