Laserfiche WebLink
iii iiiiiiiiiiiu iii <br />999 <br />CF&I STEEL CORPORATION ~ , <br />~ A subsidiary of Crane Co. <br />181N Iu~l P.O. Box 3l6 <br />• ®TEnL <br />~~ Pueblo, Cplorado 81002 <br />May 3, 1982 <br />Ms. Susan Mowry <br />Reclamation Specialist <br />State of Colorado <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Ms. Mowry: <br />Re Miner Revision No. 1 <br />File No. C-012-81 <br />(Apache Canyon Air Shaft) <br />Enclosed are CP$I's response to concerns, raised by <br />the Division regarding the new air shaft construction in the <br />Apache Canyon. These concerns were expressed in a letter to <br />• CF$I dated April 22, 1982. <br />This letter and response may be inserted in the front <br />of the miner revision application. Five copies of this letter <br />and response are included. <br />Your prompt attention to this matter would be appreciated <br />as CFP,I desires to start construction of this shaft very <br />shortly. <br />Please feel free to call if I can be of further <br />assistance. <br />Yours very truly, <br />- ~~ ~ ~~ <br />~ ~~ <br />David W. Zeeb, P.E. <br />Mining Engineer <br />DWZ/rcm <br />Enclosures <br /> <br /> <br />