Laserfiche WebLink
<br />1 <br />i <br /> <br /> <br />1 <br />1 <br /> <br />CJ <br /> <br /> <br />1 <br /> <br /> <br />IJ <br />L <br /> <br />1 <br /> <br />f///~ <br />Western Atles <br />international <br />.,ams. ~.e.. <br />CORE LABOFRATORIES <br />TITLE _ <br />ANALYTICAL CHEMISTRY DIVISION QUALITY ASSURANCE MANUAL <br />SOP NO, REVISION N0. EFFECTIVE OATE PAGE <br />HC-QAC-02 0 1 /06/92 92 of 104 <br />When corrective actions have not eliminated the non-conformance and the <br />validity of the reported data is in question, a laboratory Section supervisor, <br />laboratory manager or the QA/OC coordinator shall contact the client. All <br />client contact should be recorded in a phone log. Copies ofl the phone log and <br />all other associated documentation should be included in the job file. <br />Non-conformance Report Forms <br />Non-conformance Report forms (or similar documentation) should be used to <br />effectively document non-conformances and corrective actions which are <br />taken to eliminate or minimize analytical problems. Analysts, supervisors, and <br />quality control personnel are encouraged to use this system to document <br />problems encountered during analysis and data reporting. A copy of the <br />corporate Non-Conformance Report form is provided in Figure 14-2. <br />Additional Non-Conformance documentation records are provided in the <br />Laboratory Documentation Manual. <br />Error Cause Removal Reports <br />Problems requiring a more extensive review process, addgtional equipment <br />purchases, upper-level management decisions, etc. are ocumented and <br />addressed using the error cause removal system, An E R coordinator is <br />assigned at each site to manage the error-cause-removalsystem and maintain <br />all error-cause-removal documentation. If problems cannot ~e handled at this <br />level, the problem is submitted to a corrective action system team for problem <br />definition and solution. <br />Corrective Action Reports <br />Corrective Action Reports are used to obtain permanent solutions to problems <br />that cannot be solved by the Non-Conformance Report end Error Cause <br />Removal processes. <br />I <br />I <br />