My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 3:50:24 PM
Creation date
11/21/2007 11:05:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/1/1992
Doc Name
QUALITY ASSURANCE QUALITY CONTROL PROTOCOLS FOR THE COLLECTION OF SURFACE & GROUND WATER QUALITY
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />' (3) All measurements should be made within as brief a period <br />' of time as possible, so that temperature or chemical <br />changes will be minimized. <br />' (4) In some cases, the instruments take a certain amount of <br />time to stabilize. This stabilization time should be <br />' noted for each measurement. <br />' (5) Instrument probes should be cleaned with de-ionized water <br />between each sampling station to prevent Bross- <br />' contamination. <br />Prior to sampling, while water is being evacuated from each well, <br />water will be poured into a separate clean vessel to measure the <br />field parameters of pH, specific conductance and temperature. The <br />first sample for field parameter measurement shall be collected <br />after approximately three casing volumes have been removed, and <br />' during the bailing of the first casing volume for low-yileld wells. <br />All instrument probes that come in contact with the saunple water <br />and the measurement vessel will be cleaned between uses by rinsing <br />' with laboratory-provided deionized water. A minimum o,~~wo sets of <br />measurements will be made at each sample location tm evaluate <br />~ ~ whether the parameters have stabilized. Samples will nqt be taken <br />until each of the parameters stabilize. The criteria for <br />stabilization are ± 0.1 pH units, ± 10$ in specific conductance <br />value, and ± 1 °C for temperature. <br />' Replicate measurements will be made a minimum of one time per <br />' sample period in the following manner: <br />(1) collect a sample of water into measurement weasel; <br />(2) measure field parameters; <br />(3) rinse instrument probes in de-ionized water; and <br />(4) re-measure field parameters in same sample. <br />' -16- <br />/ ;~c.e i <br />
The URL can be used to link to this page
Your browser does not support the video tag.