My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 3:50:24 PM
Creation date
11/21/2007 11:05:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/1/1992
Doc Name
QUALITY ASSURANCE QUALITY CONTROL PROTOCOLS FOR THE COLLECTION OF SURFACE & GROUND WATER QUALITY
Type & Sequence
TR6
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(2) that the correct analytical methodology was employed; <br />(3) that samples were analyzed within the holding times as <br />defined in Table 5; <br />(4) that the in-house laboratory quality control samples fall <br />' within prescribed limits and that a sufficieht quantity <br />of QC samples were analyzed; <br />(5) that the reporting format is correct; and <br />' (6) that the sample identities are reported correctly. <br />2.1.15 4uality Control Check of Analytical Results: If any items fill outside <br />of the control limits of the quality control check tlhe Project <br />Manager will contact the laboratory to endeavor to nesolve any <br />discrepancies. If the problem encountered is a typographical error <br />' the laboratory will issue a corrected report. Quality control <br />deficiencies affecting the validity of the analysis will be <br />reported and discussed with the Project Manager to evaluate what <br />' corrective measures should be taken. <br />' 2.2 Ground Water Samnle Collection <br />This protocol outlines procedures and equipment for the collection <br />of representative ground water samples from the monitoring wells. <br />' 2.2.1 Cleaning of SamplinP ui ment: All equipment (pumps, bailler, etc. ) <br />' used for sample collection will be cleaned before sampling, and <br />b'e~tween samples. U u~ _ a~,1, , tL-~~T<~ ~ ,fGc~.w/^t~s+ Amy ~7/'~.0 /~ <br />' I J l/~''tJa't~t~-~ , C.~-w~-~.e y~/~1 '17'K ~ iel~il~v~-~i' ~ ~J~...-C~.P~{~YVt9CD~.n.f <br />J , ,. , <br />~ r <br />1 n - <br />-11- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.