Laserfiche WebLink
<br />' Before signing over the samples, the field sampling personnel will <br />t check the following items: <br />' (1) that the chain of custody and sample containers are <br />in agreement; <br />(2) that the required information has been recorded on <br />the chain of custody and the sample container; <br />' (3) that the sample container is tightly sealed and that <br />the sample has been collected in the correct <br />container; <br />' (4) that the sample has been maintained on ic@ since the <br /> time of collection; <br /> <br /> (5) that the sample has not been kept with samples <br /> from other collection areas; <br /> (6) that sufficient quantity has been collected to <br /> perform the intended analysis; <br />' (7) that there has been no deviation frorp sampling <br />protocol; and <br />i <br />(8) that the actual number of samples colleclt:ed versus <br />the number of QC samples (i.e. field dluplicates, <br />rinse blanks, and field blanks) is dhecked to <br />ensure that a sufficient number of QC samples have <br />been collected. <br />' 2.1.4 Feld Quality Control Check: A thorough review of procedures will be <br />made by the field sampling personnel to check that all quality <br />control provisions have been met. If any items are outside the <br />' -C~ <br /> <br />