My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV90688
DRMS
>
Back File Migration
>
Revision
>
REV90688
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:12:22 AM
Creation date
11/21/2007 11:05:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
6/5/1991
Doc Name
TABLE OF CONTENTS
Type & Sequence
PR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 OPERATION AND RECLAMATION PLANS <br />• <br />4.1 Objectives and Background <br />The objectives of this section are to ensure that all agencies are <br />provided with comprehensive and reliable information on the load <br />out facility, and to ensure that those operations are conducted in <br />compliance with all applicable Rules and Regulations of the <br />Colorado Mined Land Reclamation Division, the Colorado Surface Coal <br />Mining Reclamation Act, the Mine Safety and Health Administration, <br />Garfield County Special Use Permit and other appropriate Federal, <br />State and Local Authorities. <br />NCIG Financial, Inc.'s proposed coal loading facility is to be <br />located at the Clough Industrial Park, Lacy, Colorado (Figure 3.1- <br />1). NCIG has leased an existing load out facility from the Denver <br />& Rio Grande Railroad (D&RG) and intends to make some modifications <br />• to the facility for the loading of coal. This Section of the <br />permit revision provides details regarding the design, operation, <br />and reclamation of this facility. <br />4.2 General Operation Plan - Life of Operations and Five-Year <br />Permit Period <br />NCIG intends to load coal into railcars from within the Load Out <br />Permit area during the entire life of operations at this facility. <br />The approximate shipping capacities will be directly related to the <br />actual mining production rates. An estimate of future mine <br />production rates are provided in Section 4.0 in the Permit C-84- <br />065, 1990 Permit Revision. <br />The transport of coal from the mine site to the loading facility <br />will be by truck. The loaded trucks will leave the mine property <br />• NCIG - Load Out Revision 4-1 ABC/1145/910531 <br />6~5~4 f II <br />
The URL can be used to link to this page
Your browser does not support the video tag.