My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02271.0 RIP RAP <br />. PART 1: GENERAL <br />1.01 DESCRIPTION: <br />All work shall be carried out in compliance with these SPECIFICATIONS and in conformance with the <br />lines, gades and dimensions as shown on the DRAWINGS. <br />1.02 RELATED SECTIONS: <br />Refer to the following Sections for related work: <br />Section 02200.0 Earthworks <br />Section 03300.0 Cast-in-place Concrete <br />PART 2; SPECIFICATIONS AND INSTALLATION <br />2.01 MATERIAL SPECIFICATIONS <br />A. Rip rap shall consist of hard, dense, durable stone, angular in shape and resistant to weathering. <br />Rounded stone or boulders will not be accepted as rip rap material, The stone shall have a <br />specific gravity of at teas[ 2.5. Each piece shall have its geatest dimension not Beater than three <br />times its least dimension. If approved by CERTIFYING ENGINEER, removed concrete may <br />be used For rip rap provided it meets the other requirements of this section. <br />B. Material used for rip rap will be approved by CERTIFYING ENGINEER if, by visual <br />inspection, the rock is determined to be sound and dtuable. MANAGER and CERTIFYING <br />ENGINEER may require CONTRACTOR to famish laboratory results to verify that the <br />material meets SPECIFICATIONS. At the request of MANAGER, CONTRACTOR shall <br />famish laboratory test results indicating that the material meets the requirements for strengh as <br />indicated in the following table. <br />;Test DescripNoo `Test Mettiod ' . Spec cation Regniremen4 <br />Point Load Tensile Strength 300 psi (min) <br />C. Rip rap shall conform to the gradation requirements given in the following table: <br />Stone Size dot (in) Percent of Material Smaller `- Typical Stone <br /> than Typical Stones Dimensions} (in) <br />6 70 - 100 12 <br /> 50-70 9 <br /> 35-50 6 <br /> 2-10 2 <br />Notes: <br />1) d;o =average stone size <br />2) based on typical rock weight <br />3) equivalent spherical diameter <br />. 4) based on a specific gavity of 2.5 <br />D. Nominal stone size and total thickness of the rip rap shall be as shown on the DRAWINGS. <br />Section 02271 Page 1 oft March 22, 2000 <br />Rip Rap Golder Assotidtes Revision 2 <br />D.IPHASEIV pSSA CERI~APPENDiC1ESUPPENDIX E rECNMCAL SpEC~ICAT10N5W22]IR2 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.