Laserfiche WebLink
3.04 BLASTING <br />. The CONTRACTOR shall compact the surface of the azea [hat has been blasted. If the blasted surface is <br />below the Soil Liner subgrade elevation, the CONTRACTOR shall compact the blasted surface using a <br />method specification approved by the CERTIFPING ENGINEER, and then remediate according to the <br />DRAWINGS to achieve the design grades and elevations. If the blasted surface is above the Soil Liner <br />subgrade elevation, the CERTIFYING ENGINEER assess the foundation conditions and recommend <br />whether the CONTRACTOR shall overexcavate and backfill with Cemented Rockfill and Structural Fill, <br />or if the CONTRACTOR shall remove excess material and compact the fmal grade surface using a <br />method specification approved by the CERTIFYING ENGINEER. <br />*** END OF SECTION *** <br />r 1 <br />LJ <br />I <br />Section 02210 Page 3 of 3 March 22, 2000 <br />Underground Working Remediation Golder A55ociate5 Revision 1 <br />D NHASEN PSSA CERIIAPPENDIC~SUPPENDIX E TECFEYICAL SPEC6ICATIO~Sro221 X0.1 U]C <br />