My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~.^ Cot+RllnanPn of all COtIStILC[Wn aC11V1IleS 355(1e131rd sNth the Var10aS <br />• (ONTRACTOR(SI: <br />~:z scheduling and crwrdinating construction activities with rrywrrd C'QA testing and <br />activities; <br />'~i mcnrring the construction yualin control operations pcrfornlyd by the <br />CON'fRAC'1'UR(S): <br />~u~ approve specific corrective mrasuros to be implemented during COIISINC(1011 ,then <br />deviations from the SPECIFICATIONS occur: <br />~~ ensure That required quality control testine has Lien perfom,ed in accordance with the <br />C'QA Plan and In the satisfaction of the CQA Monitor, and <br />~I ensure that the C'QA prnunnrl arc provided with all dtlcumentatiun required in the COA <br />Plan and project SI'FCIFICATIpNS. <br />2.113 DF~It;\ I\(.I\I.PK: <br />In this (V:4 Pl;m the DF.tiIGN FYGINF.ER retbrs sprciticnlly to Golder Asscuunrs Inc. 'lTlc <br />DESIGN ENGINEER is the individual or timt responsible tix the design and preparation of the <br />project amstrucuun [)RAN I]GS and project SPLiC'IFICATIONS. The DE51(:N ENGINF:FR is <br />rc>lamsible (or ;tpprusing all design and project SPfCIFTG4T1ON chances, muditieuuons. ur <br />clardLLatiom rncnuntcred during construction. <br />• 2.u! ('I R'flFl'ING IiN(:INIiF.R: <br />In il•i, pl,m. ('ERTIF) ING ENGINFF.R reicrs sprciticslly to (To [tc Dctcrmincil). CERTIFYING <br />F_\GI\BF:R is the nn!isidual or lion responsible for ccrtitjing the construction was pcrtbnnrd in <br />:u:nplianee with the I1Kr\ttiISGS end tiPF.CIFIC,4~ilONS. MANAGER and CERTIFYING <br />F',NGI\F.F:R s+ill hr responsible li+r the rcsuluunn of all yualih assur;mcr issues. <br />2.05 ('(h\sfR1 CTIQN QUALII'1' ASSIiRANCF. MONITOR: <br />Ihr Construction tlualin Assurmce Monnor, also referred to as Ihr "CQA ~h,nin,r", is the fiml or <br />indnichtal resporhiblr for pcrlilmune the ('QA [asks uuthnrd in this plan. iTlc C'Q,4 Akmitor is the <br />official CQA representative of CC&~' and h;u Ihr responsibility of ovrrsrcinl: the CQA aspects of the <br />projnt. In this CQA Plan the C'QA Monitor is associated wi0t the CERTIFYING k:NGINF.ER and <br />rclcrs sprciticslly u, (T'o 4c Dclrmtincdl 1'he CQA Munitnr has the authorip to ,top any acpcct of <br />the work that is not in compliance with the CQ:4 Plan. A'i+rk would then be resunlnJ once correetivr <br />actinn has been approved by the MANAGER and CERTIF'1'I\G ENGINEER. 'fhr sprcitic <br />responsibilities ofthe C'QA Munimr include: <br />~:i. review the design DRAWINGS. pn~jen SPECIFICATIONS, and related guidance <br />ducumrnts; <br />^ review all CONTRAC'T'OR QC' submittals and make appropriate rccommcndations; <br />^ of+serve geosynlhctic material dclivcp. unloading, and storage; <br />• L^ obtain and les[ geosyntltetic conformance samples during geosynthrtics manufacture; <br />Section 111400.? Psgr_ of I I ~isrch'_?. 2000 <br />Geosymhrtic C'QA Plan Golder Associates Revision 5 <br />u rrustn inssc,xr.wml_.uir lrs~wrruvurs r rn-rmu.er.:runiinnos+w~,~w:ns rnx <br />
The URL can be used to link to this page
Your browser does not support the video tag.