My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~I("I'IU\ OI JrH1.2 C:EOSI'NTH F.TIC CO\"tiTkC('TIOV UI:ALITI' .4StiC. k,\NC'F:ICUA) PLA\ <br />• r ~kT l: lnrkc)n(Ic ru)v <br />Iht. r'an a~,Lc„es the cunstructiun yualin assurance (CQ.41 pr[+cedu«s for the instalLltion of the <br />,eos}nthruc components useJ for d:c construction of the valley Ieach Cuciliq at the C'«von 1'roj,cr. <br />l ellrr Cuuntc. Colorado. This program has been decrloped to assure that the wnstrucuun of the <br />aeosynthetic comlxmrnts arc in compliance with the project SP[CIFICATIONS anJ w demonstrate <br />that the regulatory requirements li>r the construction are achieved. <br />Thr objective of this plan is to assure that proper materials, construction techniques, and procedures <br />are followed by the CO\TkA(°iOk and that the intent of the design is met. Phis program also <br />intends to identify pn,hlcnts that may occur during construction and provide the means for resolution of <br />these problems. <br />Fhi, program nJdres>r, yuulin assurance, not quality control. 1Ttis C'C7A Plan i+ independent of the <br />qualiq control It,><'I programs conducted by the MANUFAC1l RIiRS. INSTALLF.ks. and <br />C'O\ fR,\CTURS. fhc intro[ ol'thc C'QA flan is to pmcidc independent third party vrritication and <br />testing. a+Jemonstrau that Ihr I~tiT:\LLF.k and CO\"fRACTOkS have met their obligations in the <br />supph and installation of geosynthcuc matenals accorJing a+ the design. project SPECIFICA PIONS, <br />contractual and regulatory rcyuirements. Qualiq control is pnxldrd by the MANUFACTCRERS. <br />INSTALLF.kti. and CONI'k,\C"I'ORS and refers to thu>c aai[ats taken M' Ihrm to rnsure that their <br />m:aerials and w'orkmanshlp meet the requirements ul'the plots and project SPfC'IF'IC'ATIONS. <br />fhc following section pnx'ides descriptions of the panics w this CQA plan including rhea <br />rv~ponsibilitics anA yualiticutions. <br />• :.III CCfiV: <br />In thh CQ;\ flan C(•hV refers specifically to Cripple Creek S Victor Gold Mining Company, <br />C( .~ \' I~.+ns and op:rates the valley Ieach facility. <br />2.U2 \I:\~~\(:F:R: <br />In This CQA flan the \I4NAGF:R refers spailicall} to tltr indiviJual appointed by rfrc Cr, p;e C'rerk <br />& Victor Guld !lining ('onq+am. 1'hr .\IANAGFR is the o(licial repres-entauvr of CC&V « ,ponsiblc <br />Cur all construction activities including uvcrsig)u and Jimction during construction. 'fhc !\tA\:\GER <br />is also responsible &x eourJmating wnstructiun anJ C'QA activities fife the project. <br />Thr 11.4VACER shall ,crvc as commumcutions coordinator for the pro~eet initialing preamstruction <br />and rr>.dmion meeting. :\. r,annnuucations coonlinator, the MANACF.k shall serve as a liaison <br />hcnvccn all Ionics imnlvcd :n the pnyca to ensure that ongoing cotmnunicauuns arc trwinlaincd. 1'hc <br />>f.\\:\GF.R artJ CF.RTIF')TAG I'.VGIVF:F:K shall also be responsible for the resolution of all CQA <br />issuf, lh:tl arise during the insl.dleuan of fife gam nthctiCS. <br />Duties for this position include the following: <br />l:i review artd approval of Design DRAWINGS and project SPFCIFICATTUNS fur all <br />gcoscnthctic cumpunems uFthe volley Ieach facility; <br />('reconstruction coordination with the CQ:\ Monitor to ensure that the CQA Monitor has <br />• {+arfomtrd similar «views of the design DR:\WINGi and pn~ject SPf.CIFI('ATIONS to <br />:nwrc that the CQA Plan can be implrnxmrJ; <br />tirrtion01J00.2 Page 1 of II Mush'?.?WU <br />Grosynthctic CQA Plan Golder ASSOCId(25 Revision 5 <br />[I YIIAR I\~ Kt•!!RI'Arr[]1M'IFaWI_VNY 1. r!['ll.\I<'A1 +I'FCtf lt.Albl\, bla00af IXM' <br />
The URL can be used to link to this page
Your browser does not support the video tag.