Laserfiche WebLink
PART 6.11 F.ARTN\\ORKS CONSI'RLCTION Ol'ALI'(l :\StiLRANCE <br />• Cunstnn~tion of the valley leach facility or ;rrciticd canhsvorks shall tse in uaorduncr with the <br />DR:\N'INGS anct SPGCIFICAIIONS. 4 CQA muniwnng and testing program shall br implemented by <br />('C.@V to atwrc conswction atmpliancr by the C'ONTR.ACTOR ihr CQA testing progrun shall <br />rnmiu of conswction testing of materials used in the +ellry latih 6+cilin construction. The opts of <br />nratcrias an drtirtrd in the SPf[CIPICATI(tNS [h+ring constnution. the CQ:1 Monitor shall sample and <br />test thru suit types to drtrmtinr ii they meet SPCCIFIC'A'1'It)NS. 1hr Ci1A Momu,r shall ohtain and test <br />soil sannlc+ in accn:dancc with Antrrican S+xieq fix Ttsting and Mnteriul stantLuJs ,\51'M D7S and <br />4Sf~1 ll7_n L'I tc~n shall he pcrlomsrd b} the Ci):\ >toniax on-:itc or in a gconchnical lals+sraton <br />M1.(11 C'ONSI'RUCI'ION i'f:Sl'ING: <br />Luring con;trucuun, the C(1:\ \lonitur ,hall tr,t all c.tnhwurk eungv+nents to venty that the c.mstruitiun <br />is in accordance ++ith the SPF.CIFIC'A PIONS, icuing shall Ise perforated on all x,il used in the <br />constnstion w cominn the materials meet SPEC'IFICA'TIONS. lhr ('Q:1 Monitor shall conduit testing <br />attar final pl:utimtent of the materials. The teas to be pertornted, anJ the testing frryucncy. (ur each <br />material n)sr arc listed in 1'ahles I and 2. The testing frequencies specified in Tables I and ? stt:dl hr <br />increasrJ when the CQA M1lonitor drtemtines that construction conditions (such as adverse weather, <br />equipment t,rcakdown, improprrh ballasted compactor, rscessivr lift thickness, improper soil t}pe, <br />improper nwismre conditioning and compaction) warraru additional rests. Additional resa will hr <br />:+ppro+rd M MANAGER and dirretrd by the CQA Monitor <br />e.02 CONSTRUCT ION rtONITORING: <br />Ihr C'QA Monitor swill nwniwr and test .ell c:uthwurk quality msurancc annponrnts of the cotnwctiun to <br />verily that ths: construction is in accordance with the SI'FC'IFIG\TIUNS 1'he CQA 'Monitor shall <br />• identity inad+yuate constntction meth+xlulogirs or materials thnt mar aducrsely impact the prrtitnn,utcc of <br />the facility being cunstnxtrd and csistinF uructures. hFx CQA Munitur will record visual otrx:rvations <br />throughout the aawtntction pnseas to rnsun that the materials arc placed a, the nunimum dimrasiort-s as <br />,hown.vr!i,:il!.111I\G~ t;ualincontr~ltruingwillhcpcriormedhytheCONTRACTOR. <br />6.0:.01 FOUNU~IItr~ I'I(EI'.4R:\ilON: <br />ihr CQA Matitor shall observe and document the 1•am:Lviun prrpa;auon including: <br />~~ stripping and euavmion activities to rrtsun that CONTRACTOR ptaccs the material in <br />tltr approprintt u+xkpilr (Structurd Fill. S¢Irct Structural Fill. Vndrrdrain Fill. Lrxk <br />I)etrction Fill, Low Volume Solution Collection Fill. Bedding Fill. Soil Liner Fill, Drain <br />Co+cr Fill, Fine ShaO Backfill. Pipe BeddingMaterial :+nd Granular Filter Material), if <br />stakpiling is nrcrs>ary; <br />r~ stockpiling activities to verify location of stos;kpilr. material type. and dressing: <br />ctcavations for moisture seeps, unsuitable foundation soil, devotion, and proper <br />drainage: <br />.i~ subgrade preparation w contimt that the surface of the suhgradr is free of vott, nrgvtic. <br />and othrnvisc dcleterio+rs materials (such as debris, hranches. vegetation, mud, ice, or <br />Irocen materials): and that soil and nsck surfaces That contain joints or fractures are <br />adequately tilled in sccordancr with the SPFCffICA (IONS; <br />• i,a placcmem of end hrmt anJ regraded ore slope material to confirm that it complies with <br />Section 02200 of the SPECIFICATIONS: and, <br />tieaiun OId00.1 Page S of 10 March _'?. 2000 <br />fr.anh+usrks CQA Plan Golder AssoUates Revision S <br />n na,+rv nt+crnrnrr[vuurcrwrrrnas t. ttnwk:.+r crrrmrnrwwuiuo,Kt,soc <br />