My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (30)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:12:00 AM
Creation date
11/21/2007 11:04:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix E
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s.nl rl(ECa~sT1:r<"noN MEETING: <br />• U:\N:(GER will hold a prccuastructiua nnning at the site prior to the start of aar~tnuuun <br />M:~N:(GISR. UF:SIGN F.NGIVEER. CERTIFI'I~G EXCINEF:R, CQA Monitor, CONTRACTOR. <br />.n•,d nth;. ~;c~icn::ecd by ~IANAGF.R shall atn•nd chi. ntcrtin~. The pur)x~se ul'this meeting will Ik al <br />;~ rrsirw the cnn,tnicuon t)RAW'INGS, CQA Plan. and SPECIfICA i'IONS; <br />^ deline the responsibilities of each party; <br />^ deline lints of communication and authority; <br />^ rcsiew method ul'dlxurncntation, testing pruccdures, and rcponing inspection data; <br />~ii.~ establish testing protocols and procedtucs for correcting and documenting construction <br />deficiencies: and <br />~i discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />^ I hi, meeting will he documented by ft1,\NAGFR and copits will be distributed to all <br />pdrtics. <br />c.n: PR(x:RF:55 MF.F.1'ING5: <br />• MANAGER will holJ a daily progress nxti-ting, either belim the slaty of work rr at the con:plcuun of <br />work. .At a mininwm, this meeting will !%: attended by the CQA Munialr :cod CONTRACTOR The <br />pugwse o(This meeting will he to: <br />rceicw all the previous day's ucwmplishments and activiti~•s; <br />~l~ rnicw scheduled work location and activities for the day; <br />diuuss any problems or potential construction problems; and. <br />^ ::, u•„ :rst data. <br />1.113 I)I:FI<'IF.~(1 Mia:1'I~<:5: <br />til%Yi:d meetings will he held, :u needed, m discuss potential prnhkms ur delicicncirs. At a minimum, <br />these makings will he un.•ndcd M the CQA Alnnin>r anJ ("ON'fRA("fOR If the problem relates to e <br />design issue, MANAGER. DEti1GN ENGINF:F:R and ('FRTIFIiIK: F:NGINF.ER slwuld also be <br />present. "fhc mecung wdl he daeumcnrcd by the CQ.4 fs(nnitur. <br />• <br />Jectiun OI~IIU. I Pagc •t of I U March .?, 21>DU <br />f:anhwvr)u CQA Plan Golder Associates Revision 5 <br />D i1N1f1Y KN Cli^1'~NYI KUN'I[ SIMI'F ~Dlt P ILrll\IC LL Vf(R)rAi W~S01~:0'.^, 1%K <br />
The URL can be used to link to this page
Your browser does not support the video tag.