Laserfiche WebLink
Operator's Outline <br />• Operator's Outline Summary of the Pikeview Ouarry Permit <br />The following is a summary of the key points for the Pikeview Quarry mining and <br />reclamation plans. This summary is not intended to replace the detailed plans contained in the <br />permit, but simply to provide a listing of key areas of the plan the operator should pay <br />particular attention to. In all cases, details regarding these subjects are contained in the actual <br />plan documents and reference should be made to those exhibits to fully understand what is <br />required. <br />Format of the permit. <br />A. The permit document is designed to replace all previous permit documents. In <br />essence, this permit document is the plan for this operation and all previous <br />permitted plans should be considered useful for historical purposes only. <br />B. Key documents for operator use during plan implementation <br />1. Mining Plan Map (Exhibit C) and Mining Plan (Exhibit D). <br />2. Reclamation Plan (Exhibit E) and Reclamation Plan Map (Exhibit F). <br />II. Permit Boundary versus Affected Land Boundary <br />A. The permit boundary defines the limit of the permitted area. <br />B. The affected land boundary defines the limit of the land that can be disturbed <br />within the permit boundary. <br />• C. The affected land boundary and the permit boundary are not at the same <br />location in all places. <br />1. Where the affected land boundary is not specifically labeled on the <br />maps the affected land boundary is the same as the permit boundary. In <br />those cases, the permit boundary, as shown on the map, is the limit of <br />disttubance that is allowed. Ho disturbances beyond that boundary <br />should occur at any time. <br />2. Where the affected land boundary is specifically labeled and differs <br />from the permit boundary location, the affected land boundary is the <br />limit of disturbance. The land between the affected land boundary and <br />the permit boundary is essentially a buffer zone and is not to be <br />affected. <br />D. The affected land boundary, whether identical to or different from the permit <br />boundary, must be marked on the ground so it can be identified by yourself <br />and by inspectors from the Colorado Division of Minerals and Geology. This <br />is a requirement of the regulations. <br />III. Phases <br />A. Mining is to occur only in Areas MV, MS, and H, as shown on the maps. No <br />mining is to occur in any of the other areas. Mining is defined as the actual <br />extraction of rock and does not include processing, stockpiling, or other <br />operations done after the actual extraction. <br />. B. Reclamation is to occur th all areas, but only reclamation work is allowed in <br />Areas RN and RB. <br />Pikeview l]uarry Amendment Page 1 <br />