Laserfiche WebLink
<br />'i <br />Minor Revision No. 114 Page 2 <br />March 7, 1994 <br />7. Will there be a structure associated with the pump? <br />8. The Division has estimated, from the map provided with <br />the application, that the following lengths of pipeline <br />and the number of concrete supports will need to be <br />removed: <br />Mine Water Line <br />Surface: <br />6" diam <br />?" diam <br />steel pipe <br />steel pipe <br />1200 feet <br />1200 feet <br />Buried: <br />6" diam <br />?" diam <br />steel pipe <br />PVC or HDPE pipe <br />170 feet <br />170 feet <br />Concrete Supports (@ 25' intervals - surface) 48 <br />Thrust blocks <br />Potable Water Line <br />Surface: <br />6" diam. HDPE pipe 2480 feet <br />?" diam. HDPE pipe 2480 feet <br />Buried: <br />6" diam. HDPE pipe 220 feet <br />?" diam. HDPE pipe 220 feet <br />Concrete Supports (@ 8' intervals - surface) 310 <br />Thrust blocks <br />Costs for removing pipe will be estimated as one pipe, <br />and not two, as the previous list indicates. MCC should <br />confirm these measurements. <br />Please remember when a revision is submitted with pages that will <br />be incorporated into the permit, three copies should be sent. <br />Please call me if you have any questions. <br />Si ely, <br />Christine E. Joh n <br />Environmental Pr to tion Specialist CEJ/007MR114 <br />