Laserfiche WebLink
PAGE 4 <br />JUNE 12, 1996 <br />DAN MATHEWS <br />a. Use compactor to imprint the buffer area between the northerly edge <br />of the refuse area and the inlet to the pond. <br />b. Remove river rocks from the final ditches and replace with graded, <br />angular durable rocks. <br />c. Remove the existing cobble dams and reconstruct as per design <br />criteria. <br />4. In the fall of 1996, seed and mulch permanent collection and diversion ditches <br />on RP-4 and RP-5 as well as any RP-2/3 ditch segments not currently <br />impacted by active refuse drainage and frequent maintenance. <br />5. In all of 1996, grade the northwest disturbed area of RP-4 that does not <br />2 Ilea any runoff; seed and mulch. <br />~'~~ <br />I trust this letter adequately addresses DMG's concerns. Three copies of the following revised <br />documents are endosed for your files: page IV-24; IV-24A (Figure IV-1); IV-24B (Figure IV-2); IV- <br />25; IV-42; V-42; V-44, Map 76 and Map 77. Table of Contents for Illustration 44 and SEDCAD runs <br />for insertion at the end of Illustration 44 provided with the original application should also be used. <br />I am also enclosing a copy of the public notice that was published in the Rangely Times. <br />If you have any questions, please call. <br />Sincerely, <br />Murari P. Shrestha, P.E. <br />Assistant Manager of Engineering <br />MS:Igp <br />ce: Raja Upadhyay <br />Jeff Dubbert <br />BLM -Meeker <br />Larry Nine - OSM <br />Town of Rangely for public display <br />