Laserfiche WebLink
Mr. Lane Osborn <br />Cohrado State Land Board <br />Northwert District Office <br />Page 4 <br />The three (3) ponds (PECOCO, 004 and 008) requested for retention as permanent features are further located and <br />described as follows; <br />Townshi~5 North. Range 87 West <br />• Section 2 - SW %, NW <br />PECOCO Pond <br />• Section 12 - SW 'G SE '/+ <br />Pond 004 <br />Township 5 North. Range 86 West <br />• Section 7 - NW %, NIY/'/. <br />Pond 008 <br />The physical locations of the above-described ponds aze shown on attached Map SLB-1, State of Colorado Ckvnership <br />of Permanent Features. <br />The State Engineer's Office (SEO) was contacted by the CDMG concerning the retention of the sediment ponds <br />within the Seneca II permit boundary. Following is the SEO comment and SCC's response: <br />State EngineePs Office Comment: <br />`9'kore advise the operator that ar ax undecreed rtmcture, the priority for Pand 008 it corrridered to be the most junior in the ryrtem, <br />and that even the 1982 decree for Pond 004 it very junior when compared to existing mater nigh#. Therefor, the potential exiru that <br />the pondr will be orrt-af-pnoriiy at come time, axd shat abrent a decreed plax for auginentatiox the owner wiU be vzguind to either <br />byparr or rekare out-of-priority ixjlomr, ixcluding lowerixg the pond elevatiox to acmunt for outof-pszority inf7amr that replan <br />evaporative lamer. <br />Ar rush, it it advirabk to mxrtruct low-level outktr capable of relearing all rtorage firm the rtructuree: Abrent rush outktr, the <br />Divirlon Engineer hat the authority to order the inrtallationr of ruck rtrrrcturer or breech of the rtructrrre to arrnre that renior <br />appropriators receive the water to which they are entitled by law. " <br />SCC Response: <br />SCC will provide a flexible siphon pipe at each structure (Pond 004 and 008) to allow the release ofout-of-priority <br />inflows and the out-of-priority inflows that replace evaporative losses. <br />The ponds in question are currently constructed with principle spillways to allow the dischazge of in-flows on a <br />continuous basis. The only situation where there is no discharge is when evaporation is greater than the in-flow or <br />there is no in-flow. SCC understands that the Division Engineer has the authority to order the installations of low- <br />level outlets capable of releasing all storage from the structures or breech of the structure to assure that senior <br />appropriators receive the water to which they aze entitled by law. <br />SCC will fully inform the landowner of the SEO's authority and all implications of the water rights issues, during <br />the formal request process for retaining the structures as permanent. In the case of Ponds 004 and 008, the <br />Colorado State Land Board is the owner of record. <br />