<br />EXHIBIT D <br />Reclamation Plan <br /> <br />Upon completion of the excavation, all areas will be leveled and regraded to form a <br />gradual slope that blends in with the undisturbed adjacent ground. Additional topsoil material <br />from newly disturbed area or imported topsoil material to provide quantities sufficient to replace <br />3-4 inches for the entire reclaimed area will be provided. Supplementing the plant growth <br />medium with 10-20 tons per acre of organic matter (manure) will be part of the reclamation <br />process. <br />As needed, all packed aeeas will be ripped and disked prior to revegetation. Measures <br />taken to revegetate the site will be in accordance with reclamation plan recommended by Natural <br />Resource Conservation Service. Refer to attached N.R.C.S. sheet. <br />