Laserfiche WebLink
<br />6. MCC will utilize the Division's guard rail measurement and revise the bond later, if <br />necessary, after the as-builts are completed. <br />7. The revised bond summary includes the suggested credits. <br />8. The revised bond summary includes the surplus resulting from TR64. <br />Miscellaneous Page Chanties <br />Page 2.05-56 has been revised to include the riparian buffer zone figure. <br />2.-5. This response is in separate MCC corcespondence. <br />6. The Table of Contents has been corrected. <br />7.-8. This response is in separate MCC corcespondence. <br />Please do not hesitate to contact me should you have further questions. We look forward to your <br />approval so that construction can begin as soon as possible. <br />Sincerely, <br />~~,~ ~~~ <br />Kathleen G. Welt <br />Environmental Supervisor <br />KGW/mer <br />-3- <br />