My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV89564
DRMS
>
Back File Migration
>
Revision
>
REV89564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:11:27 AM
Creation date
11/21/2007 10:52:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Revision
Doc Date
1/8/1985
Doc Name
MEMO BIOLOGICAL OPINION STORM KING MINES COAL RIDGE 1 MINE
From
USFWS
To
BLM
Type & Sequence
MR18
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
against which project depletions are assessed in calculating a project's <br />proportion of the conservation measure costs. <br />The effects of depletions that bring present day flows down to lower levels <br />are to be offset by the project sponsor funding these measures which are <br />outlined in active research and management plans. F~YS has identified <br />certain conservation measures that are currently considered necessary. <br />These measures include but are not limited to monitoring known populations <br />and attempting to locate new areas containing the fish; further analyzing <br />the potential effects of water depletions and associated flow regimen <br />modifications; locating existing and potential spawning and YOY rearing <br />areas; researching and construction various fish passage and habitat <br />restoration features; and producing the fish in a hatchery facility for <br />research and restocking of individuals in existing and historical habitat. <br />Since such measures will develop critically important data on the needs of <br />the fish, funding of these activities by the project sponsor is considered a <br />reasonable conservation measure designed to compensate for the adverse <br />effects of water depletion. Linder a procedure developed by the EZVS, upper <br />basin project sponsors are assessed a proportion of the total cost needed to <br />support these conservation measures, currently estimated at 25 million <br />dollars. <br />Based upon the water use projection that is being evaluated in this <br />consultation, 356 of/yr for the SKM Project, the cost of the conservation <br />measures funded that will offset total impacts will not exceed x5,313.43. <br />This dollar amount, when applied to funding of conservation measures <br />identified in this biological opinion, will offset all of the impacts of the <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.