Laserfiche WebLink
.. <br />' MAP: The attached map is derived from the Grading and brainage Plan map <br />submitted in response to Philip Saletta's concern over the shop elope <br />expressed in his inspection report. The red lines show the contour <br />changes which would occur as a result of backfilling the old roadway <br />area as well as meshing that area with the sediment pond. Blue outlines <br />the area to be regraded. Green outlines the seep area to be excavated <br />and replaced with a more porous material. The 72" pipe placement is <br />also shown and a new arrow replaces the old arrow and indicates the <br />direction of flow of the 5 cfs of water (rather than 11 cfs). All other <br />features will remain approximately as shown on the map. <br />PERMIT BOUNDARY: All of these revisions and changes occur totally <br />within the existing permit boundary. No additional acreage will be <br />affected which has not been included in the permit already. <br />Furthermore, most of the actions to be taken are within areas which have <br />generally been previously disturbed. <br />IMPACT ON RECLAMATION AND BONDING: In our opinion, there will be no <br />effect on the overall mining or reclamation plans. We do not believe <br />there should be any effect on the amount of the bond for the operation. <br /> <br />Page 6 of 6 Pikeview TR N0.6 July 1987 <br />