Laserfiche WebLink
APR i,;' '9c ~J3~tJ1PM • <br />• F.ic c- <br />APPENDIX V <br />REPLY TO DOC N0. 2382F: POINT (4) <br />MONITORING OF PROJECT <br />BEI suggests that Lhe monitoring program discussed below applies gnly to the 42 <br />day free-cyanide reduction program. It accepts that monitoring must continue but <br />suggests this remains for later discussion. <br />The species to be monitored shall be Free and WAD cyanide; if the State still <br />insists, then of course Total shall also be determined. These analyses shall be <br />conducted at least once-a-day and the results that are obtained reported to the <br />State immediately. A continuous log of all data shall be kept by BMG and BEI to <br />confirm Free-CN reduction, / ~~ <br />Free CN shah be determined at the following locations: <br />1. In the tailings prior to Cytox addition. <br />2. At the spicket where the tailings enters the settling pond'. <br />3. In the settling pond 5 ~1~~- <br />a. In the collector pondf~ <br />WAD shall be measuretl at the spicket and it shall be presumed that this level <br />will be the same in all other areas. <br />in addition, the beach zone shall be monitored for "slime" that could indicate <br />a system-acidify change. -~ ~~ 5~,~_ ~ ~~ ~~ . <br />The lever of the metals Cu, Zn and Fe shall also be determined and equally <br />reported. <br />